Laserfiche WebLink
iM0 <br /> 00 <br /> ON - Y - _ - - .2 +ra N ME <br /> �� W-0 <br /> 1 <br /> l <br /> II ' <br /> 1 <br /> SCOPE OF WORK <br /> I <br /> Work performed by PACIFIC included a water supply well survey to determine the <br /> proximity of the site to groundwater supply wells, a literature and map search prior to <br /> conducting field activities;and the installation of three groundwater monitoring wells as <br /> outlined in PACIFIC's work plan dated May 14, 1990. <br /> e <br /> On October 24 and 25, 1990, PACIFIC installed groundwater Monitoring Wells U-1 <br /> through U-3 at the locations shown on Figure 2. The wells were constructed with 3- <br /> '27 <br /> rnch: <br /> drameter PVC casing and are screened from 7 to 27feetbelow`grouud.-surface: So1I'" { <br /> ' samplesLwere collected at 5-foot'midi-als during drilling, and selected "sarnpies were <br /> submitted for analysis by a State-certified analytical laboratory. The wells were <br /> installed as described in the investigative procedures section of this report <br /> p <br /> (Appendix A). All site wells were developed and sampled on November 11, 1940 in . <br /> 1: <br /> accordance with the procedures outlined m Appendix A. At this time, depth to water <br /> measurements were recorded for hydrologic calculations. The wells were surveyed for <br /> location and elevation by a State-registered surveyor. <br /> :µ 2 <br /> r <br /> } V - <br /> 3 <br /> i - <br /> 4 <br /> 3100101/REPORT 3 . February 13,1991 <br /> s <br />