Laserfiche WebLink
G ETTLE R - RYAN INC . WELL SAMPLING <br /> General and Environmental Contractors FIELD DATA SHEET <br /> COMPANY 3. P. JOB # 99Vf -. g0 <br /> LOCATION 8,103 W . Zus. L-6 -')CS- DATE <br /> CITY TIME <br /> Well ID. U— Well Condition 01'C <br /> Well Diameter -3 in. Hydrocarbon Thickness ft_ <br /> Total Depth l `� ft Volume 2" = 0.17 6' = 1.50 12" = 5.80 <br /> Factor 3" = 0.38 8" = 2.60 <br /> Depth to Liquid— <br /> Liquid— 7 _ ft (VF) 4" = 0.66 10" = 4.10 <br /> ( cas n ) 5 x c x(VF) 3$ = sP rgee gal. <br /> \volumes/ Volume <br /> Purging Equipment IDD <br /> Sampling Equipment r9c..LL" <br /> Starting Time l ' 9 Purging Flow Rate ll 3 gpm- <br /> stimate /(ur <br /> ging Anticipated <br /> volume gal. Rate gpm. PTime g min. <br /> Time pH Conductivity Temperature Volume <br /> 2-2 <br /> ( , 7 �— 7 , y L— c �j y L. <br /> Did well dewater? 'G if yes, time Volume <br /> Sampling Time f Weather Conditions FJc_ <br /> Analysis C,k1 9-(M) 7fu- Bottles Used <br /> +.r Chain of Custody plumber — <br /> colocarts <br />