Laserfiche WebLink
GETTLER - RYAN INC . <br /> WELL SAMPLING <br /> General and Environmental Contractors FIELD DATA SHEET <br /> L nn <br /> COMPANY JOB ## 5RY4 40 <br /> LOCATION 8 Z03 w. �Us� Ion P 2.0 .E DATE 1 '2 /- C72 <br /> CITY --) f� TIME <br /> Well ID. V 1 Well Condition 0 /( <br /> Well Diameter 3 in Hydrocarbon Thickness — ft. <br /> Total Depth 2 (,. y ft Volume 2" = 0.17 6" = 1.50 12" = 5.80 <br /> Factor 3" = 0.38 8" = 2.60 <br /> Depth to liquid- ft (VF) 4" = 0.66 10" = 4.10 <br /> of <br /> 1W <br /> /� <br /> (Cl <br /> sing ) xg1 X(VF) —(-sPumrgeeJgaolumes \ Volume <br /> Purging Equipment <br /> Sampling Equipment U C.., <br /> Starting. Time (O 30 Purging Flow Rate -� gpm• <br /> /kstimatec� - _ / <br /> 1 Purge I 3 gal. /( Rao I . .gpm• ` PnTi g g d1 a <br /> Volume/ <br /> S' Time pH Conductivity Temperature Volume <br /> � .3a r..+ g; �s_ 3 3 <br /> �j0 �� • i fL ra� <br /> "Did well dewater? Yui If yes, time ( 03 `f Volume <br /> r � <br /> Sampling Time_ 1 L Weather Conditions P� C- <br /> Analysis F D, 4, Bottles used .3 X�'I a -2 X C-- <br /> Chain of Custody Number <br /> cofntn M <br /> r. <br /> POrtsunn - Cc. ✓I ��.� <br />