Laserfiche WebLink
t <br /> ° S J C O G, Inc. <br /> 555 East Weber Avenue • Stockton,CA 95202 • (209)235-0600 • FAX(209)235-0438 <br /> F San Joaquin County Multi-Species Habitat Conservation &Open Space Plan (SJMSCP) <br /> SJMSCP RESPONSE TO LOCAL JURISDICTION (RTLJ) <br /> ADVISORY AGENCY NOTICE TO SJCOG,Inc. <br /> To: Rick Griffin,San Joaquin County Community Development Department <br /> From: Kimberly Juarez, SJCOG, Inc. <br /> Date: December 2, 2010 <br /> Local Jurisdiction Project Title. N/A T <br /> Assessor Parcel Number(s): 017-180-12 Local Jurisdiction Project Number: PA- 1000264 <br /> Total Acres to be converted from Open Space Use: Undetermined <br /> Habitat Types to be Disturbed: Agricultural/Urban Habitat Land ' <br /> i <br /> Species Impact Findings: Findings to be determined by SJMSCP biologist. <br /> Dear Mr. Griffin: <br /> SJCOG, Inc. has reviewed application PA- 1000264. This project includes a site approval application for a small winery to <br /> include the construction of a 2400-square-foot wine production building which includes a 400-square-foot wine tasting <br /> room area. The project also includes an 800-square-foot outdoor production area. The small winery proposes four <br /> r marketing events and one special event per year for a maximum of 40 people for each event. The project is located on <br /> the north side of Acampo Road, 1366 feet east of Buck Road, 10171 E. Acampo Road, Acampo. <br /> San Joaquin County is a signatory to San Joaquin County Multi-Species Habitat Conservation and Open Space Plan <br /> (SJMSCP). Participation in the SJMSCP satisfies requirements of both the state and federal endangered species acts, <br /> and ensures that the impacts are mitigated below a level of significance in compliance with the California Environmental <br /> Quality Act (CEQA). The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate Incidental Take <br /> Minimization Measure are properly implemented and monitored and that appropriate fees are paid in compliance with the <br /> SJMSCP. Although participation in the SJMSCP is voluntary, Local Jurisdiction/Lead Agencies should be aware that if <br /> project applicants choose against participating in the SJMSCP, they will be required to provide alternative mitigation in an <br /> amount and kind equal to that provided in the SJMSCP. <br /> This project is subject to the SJMSCP and is located within the unmapped land use area. Per requirements of the <br /> SJMSCP, unmapped projects are subject to case-by-case review. This can be a 90 day process and it is recommended <br /> that the project applicant contact SJMSCP staff as early as possible. It is also recommended that the project applicant <br /> obtain an information package. http://www.sjcog.org <br /> After this project is approved by the Habitat Technical Advisory Committee and the SJCOG Inc. Board, the following <br /> process must occur to participate in the SJMSCP: <br /> I <br /> • Schedule a SJMSCP Biologist to perform a pre-construction survey prior to any ground disturbance I <br /> j <br /> ■ Sign and Return Incidental Take Minimization Measures to SJMSCP staff(given to project applicant after <br /> pre-construction survey is completed) <br /> ■ Pay appropriate fee based on SJMSCP findings. Fees shall be paid in the amount in effect at the time <br /> of issuance of Building Permit <br /> ■ Receive your Certificate of Payment and release the required permit <br /> It should be noted that if this project has any potential impacts to waters of the United States[pursuant to Section 404 Clean Water Act], <br /> it would require the project to seek voluntary coverage through the unmapped process under the SJMSCP which could take up to 90 <br /> days. It may be prudent to obtain a preliminary wetlands map from a qualified consultant. If waters of the United States are confirmed <br /> on the project site, the Corps and the Regional Water Quality Control Board (RWQCB) would have regulatory authority over those <br /> mapped areas[pursuant to Section 404 and 401 of the Clean Water Act respectively]and permits would be required from each of these <br /> resource agencies prior to grading the project site. <br /> I <br />