Laserfiche WebLink
The primp station, sheat off veva access and all electrical cclaaipaaac nt shoal I be <br /> clay flood prcacfed to a anl.nlaa urn o ' " NGV.D per ASCE 24-05,, <br /> Pump station shall be constructed to resist buoyancy, hydrostatic and <br /> hydrodynamic forces per ASCE 24-05a <br /> Pipe lave shall he backfilled per ASCE 24-05, <br /> Electrical circuitry shall be per (,', 4-05� <br /> Pumps shall have manual sheat off valves up and clown stream of each. <br /> Check valves shall have manual shut ol'l'valves up and clown sere am of each. <br /> Pipe liras shill be secured at to prevent flotation until the lime isfilled and the <br /> ditch back, filled and compacted. <br /> valve shall be placed in the drain lues b t%veen the pump station and the <br /> check: valve vault, <br /> i <br /> tt <br /> { x s <br /> k 3 <br /> 4 k <br /> :r <br />