My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007784
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
10948
>
2600 - Land Use Program
>
UP-01-0009
>
SU0007784
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 4:41:11 PM
Creation date
9/4/2019 9:43:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007784
PE
2656
FACILITY_NAME
UP-01-0009
STREET_NUMBER
10948
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WY
City
MANTECA
APN
20402004
ENTERED_DATE
6/22/2009 12:00:00 AM
SITE_LOCATION
10948 S AIRPORT WY
RECEIVED_DATE
6/22/2009 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\10948\UP-01-09\SU0002162\APPL.PDF \MIGRATIONS\A\AIRPORT\10948\UP-01-09\SU0002162\CDD OK.PDF \MIGRATIONS\A\AIRPORT\10948\UP-01-09\SU0002162\EH COND.PDF \MIGRATIONS\A\AIRPORT\10948\UP-01-09\SU0002162\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> f <br /> 96 cents per month. Depending on the operating recirc-ratio,multiple-pass recirculating PBFs may <br /> cost 3 to 5 times more to operate than single-pass PBFs, depending on the operating recirc-ratio. <br /> Low routine maintenance requirements—:Annual routine maintenance for PBFs is recommended <br /> and normally includes inspection of effluent for clarity (e.g.,turbidity, grease and oily films, foam, <br /> color, etc.) and odor, as well as cleaning pump filters and flushing distribution piping if necessary. <br /> Because PBFs are designed to limit cell mass growth by controlling the organic loading rate and <br /> encouraging endogenous respiration, sludge removal is not required from the PBF itself. Solids do <br /> build up in the septic tank and must be removed periodically. The pumping of septic tank solids can be <br /> e <br /> as infrequent as every 12 years or more if solids accumulations are"monitored" eve 2-3 ears to <br /> determine when the tank actually needs p1iWinfr. <br /> Ease of maintenance—Maintenance of pre-manufactured, packaged PBF's is particularly service <br /> friendly and especially suited for management programs, due to a)Training and certification of <br /> installers and service providers, b) Detailed installation and operation manuals that identify specific <br /> sevice,testing and troubleshooting techniques, c) Specially engineered mediums, as shown in Figure <br /> 9, that can be cleaned with a small pressure washer in the event of system abuse or overuse and put <br /> back into service within a matter of minutes, and d) Controls that monitor and alert service providers <br /> directly upon electro-mechanical malfunctions, as well as water usage and system functioning <br /> abnormalities. <br /> As a result, the management of onsite systems can be as user-friendly, effective, reliable, and trouble- <br /> free as the municipal gravity alternative and, in the event of an individual malfunctions,much more <br /> manageable and environmentally friendly. <br /> Figure 9: Typical servicing of AdvanTex <br /> textile medium. (An underdrain valve is <br /> opened during a filter washdown that <br /> allows sloughed solids to flush back into the <br /> process tank,so there is no removal or <br /> wasting of media.) <br /> NTP-FLT-TRB-1 <br /> Rev.1.1,11102 <br /> Pa Oe 9 of 12 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.