My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007784
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
10948
>
2600 - Land Use Program
>
UP-01-0009
>
SU0007784
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 4:41:11 PM
Creation date
9/4/2019 9:43:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007784
PE
2656
FACILITY_NAME
UP-01-0009
STREET_NUMBER
10948
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WY
City
MANTECA
APN
20402004
ENTERED_DATE
6/22/2009 12:00:00 AM
SITE_LOCATION
10948 S AIRPORT WY
RECEIVED_DATE
6/22/2009 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\10948\UP-01-09\SU0002162\APPL.PDF \MIGRATIONS\A\AIRPORT\10948\UP-01-09\SU0002162\CDD OK.PDF \MIGRATIONS\A\AIRPORT\10948\UP-01-09\SU0002162\EH COND.PDF \MIGRATIONS\A\AIRPORT\10948\UP-01-09\SU0002162\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Installation Guide: Commercial AdvanTex" Systems <br /> teP: Epe firern�a�`=;e.p�; :gm: }��_ <br /> ® Make sure these items have been completed before scheduling <br /> an Orenco representative for system start-up: <br /> • All plumbing connections have been completed. <br /> - All electrical connections have been completed. <br /> ry <br /> ° • A phone line has been connected to the control panet <br /> All tanks have been successfully tested for watertightness. <br /> • All recirculation tanks are 75%full. <br /> An Orenco representative will perform the system start-up, <br /> going through an exhaustive checklist to guarantee your com- <br /> mercial AdvanTex Treatment System is in working order. In <br /> addition to logging project and system information,the Orenco <br /> representative will verify proper installation of components <br /> including, but not limited to, the following checklist items: <br /> Primary Treatment System <br /> • Septic Tanks <br /> • Septic Tank Pumping Equipment <br /> • Septic Tank Controls <br /> • Grease Tanks <br /> E Secondary Treatment System <br /> • Recirculation Tanks <br /> • Recirculation Tank Pumping Equipment <br /> • Recirculation Tank Controls <br /> • Distributing Valve Assembly <br /> • Ventilation Fan System <br /> • AdvanTex Filter Operation <br /> Dispersal System <br /> • Dosing Tank <br /> • Dosing Tank Pumping Equipment <br /> • Dosing Tank Controls <br /> • Distribution Valve Assembly <br /> The Orenco representative will inspect the AdvanTex System <br />` for proper installation,test all components, document initial <br />` performance values, and verify that all system components are <br /> functioning properly. <br /> The engineer, contractor, electrician, and operator should all be <br /> present at system start-up. <br /> ©2003 Orenco Systems*Inc. NIM-ATX-AX-2 <br /> Rev 1.0,2103 <br />
The URL can be used to link to this page
Your browser does not support the video tag.