My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007784
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
10948
>
2600 - Land Use Program
>
UP-01-0009
>
SU0007784
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 4:41:11 PM
Creation date
9/4/2019 9:43:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007784
PE
2656
FACILITY_NAME
UP-01-0009
STREET_NUMBER
10948
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WY
City
MANTECA
APN
20402004
ENTERED_DATE
6/22/2009 12:00:00 AM
SITE_LOCATION
10948 S AIRPORT WY
RECEIVED_DATE
6/22/2009 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\10948\UP-01-09\SU0002162\APPL.PDF \MIGRATIONS\A\AIRPORT\10948\UP-01-09\SU0002162\CDD OK.PDF \MIGRATIONS\A\AIRPORT\10948\UP-01-09\SU0002162\EH COND.PDF \MIGRATIONS\A\AIRPORT\10948\UP-01-09\SU0002162\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Installation G Wle: AdvanTekm-AX Treats nt Systems <br /> The operation of the pump in the second compartment is controlled by a programmable timer in the <br /> Control Panel, which allows the pump to dose the filter for short periods (usually a minute or less), <br /> from 50 to 100 times a day. This frequent "micro-dosing," which optimizes the treatment process, <br /> occurs 24 hours a day, to maintain the proper biological environment. <br /> l a" <br /> ,7 � J. <br /> WE <br /> Installation-Ste s <br /> n <br /> l' <br /> The following installation steps are discussed in detail on the following pages. Please read,through a <br /> the entire installation guide before begin= installation. Failure to do so may cause installation <br /> delays and/or improper system operation. Note: You'll need a 1-9116" holesaw, in addition to standard <br /> pipe fittings. <br /> Step 1: Determining Positions of the Processing Tank and AdvanTex Filter <br /> Step 2: Excavating Hole for Processing Tank and AdvanTex Filter <br /> Step 3: Placing Processing Tank and AdvanTex Filter <br /> Step 4: Installing Access Risers on Processing Tank <br /> Step S: Installing Recirculating Splitter Valve <br /> Step 6: Installing Filtrate Return Line and Discharge Line <br /> Step 7: Installing Passive Air Vent <br /> Step 8: Installing Biotube' Pumping Package <br /> Step 9: Installing Transport Line <br /> Step 10: Installing Control Panel <br /> Step 11 : Checking for Watertightness <br /> Step 12: Backfilling Installation <br /> Step 13: System Start-Up <br /> © 2001 Grenco Systems Inc. EIM-ATX-AX-1 <br /> Information suhjcr.t to change without notice Rev 1.48/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.