My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007784
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
10948
>
2600 - Land Use Program
>
UP-01-0009
>
SU0007784
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 4:41:11 PM
Creation date
9/4/2019 9:43:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007784
PE
2656
FACILITY_NAME
UP-01-0009
STREET_NUMBER
10948
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WY
City
MANTECA
APN
20402004
ENTERED_DATE
6/22/2009 12:00:00 AM
SITE_LOCATION
10948 S AIRPORT WY
RECEIVED_DATE
6/22/2009 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\10948\UP-01-09\SU0002162\APPL.PDF \MIGRATIONS\A\AIRPORT\10948\UP-01-09\SU0002162\CDD OK.PDF \MIGRATIONS\A\AIRPORT\10948\UP-01-09\SU0002162\EH COND.PDF \MIGRATIONS\A\AIRPORT\10948\UP-01-09\SU0002162\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> STAFF REPORT = Use Permit <br /> Application Information <br /> Owner: John Bodnar <br /> Applicant: Central Valley Baptist Church <br /> File Number: UP-01-9 <br /> Location: On the east side of Airport Way,2000 north of Roth Road, north of Manteca <br /> Address: 10948 South Airport Way, Manteca <br /> General Plan: AIG Community: None <br /> Zoning: AG-40 APN: 204-020-04 <br /> Project Size: 5.5 acres Parcel Size: 16.66 acres <br /> Water Supply: Well Sewage Disposal: Septic <br /> Storm Drainage: On-Site 100-Year Flood: No <br /> Williamson Act: No Supervisorial District: 3 <br /> Staff: Jennifer Jolley CEQA Determination: Negative Declaration <br /> Pro'ect Description <br /> The applicants are proposing to establish a neighborhood church in two (2) phases. Phase I includes <br /> construction of a 6,400-square-foot church and will be completed within 18 months from the date of <br /> approval. Phase it includes demolition of the existing single-family residence and construction of a 24,000- <br /> square-foot multi-purpose room and will be completed within five years from the date of approval. Services <br /> will typically be held on Wednesdays from 7:00 p.m. to 8:30 p.m. and on Sundays from 10:00 a.m. to 12:30 <br /> p.m. and from 6:30 p.m.to 8:00 p.m. <br /> Recommendation <br /> Approval. This project is consistent with the General Plan and Board Order B-00-437, pertaining to the <br /> General Plan 2010 Review,adopted April 11, 2000. <br /> San Joaquin County UP-01-91Bodnar <br /> - Community Development Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.