Laserfiche WebLink
Farmland Trust will utilize the funds to obtain an easement. You may want to contact <br /> the American Farmland Trust if you are interested in further discussing such an <br /> alternative. <br /> The project has been removed from the Planning Commission meeting on April 4, 2002. <br /> In order to schedule the project for a future Planning Commission meeting, the applicant <br /> must submit the revised site plan materials and choose a method to mitigate the loss of <br /> agricultural land. The Community 7Development'Department's recommendation will be <br /> finalized after submittal of the above noted materials. ` If the Community Development <br /> Department recommends approval, the following Conditions of Approval, plus the <br /> chosen mitigation for the loss of agricultural land, will be included in the recommendation <br /> to the Planning Commission. <br /> Use Permit Application No. UP-01-9 was approved by the Planning Commission on . <br /> The effective date of approval is This approval will expire on , which is 18 months <br /> from the effective date of approval, unless (1) all Conditions of Approval have been <br /> complied with, (2) all necessary building permits have been issued and remain in <br /> force, and (3) all necessary permits from other agencies have been issued and <br /> remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements <br /> shall be fulfilled prior to the establishment of the use and the issuance of any <br /> building permits. Those Conditions followed by a Section Number have been <br /> identified as ordinance requirements pertinent to this' application. Ordinance <br /> requirements cannot be modified, and other ordinance requirements may apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT (Staff Contact: Jeff Fisher, 468-9653) <br /> a. APPROVED USE: This approval is for a 249-seat neighborhood church facility to !, <br /> be completed in two phases as shown on the Site Plan submitted June 14, 2001 <br /> (Use Type: Religious Assembly— Neighborhood). Phasing is approved for five (5) <br /> years and shall be as follows: <br /> • Phase I: A 2,400 square-foot steel structure to be used as a multi- <br /> purpose room; and <br /> Phase II: A 10,000 square-foot church building. <br /> b. STORM DRAINAGE: Stormwater drainage shall be retained on-site. The drainage <br /> pattern and corresponding storm drain improvements shall be shown on the Site <br /> Plan. Drainage calculations prepared by a registered civil engineer or architect <br /> shall be included. w <br /> c. PARKING: Off-street parking shall be provided and comply with the following: <br /> 1) All parking spaces, driveways, and maneuvering areas shall be surfaced and <br /> permanently maintainedwith base material of appropriate depth and asphalt <br /> concrete or Portland cement concrete to provide a durable, dust free surface. <br /> Bumper guards shall be provided when necessary to protect adjacent structures <br /> or properties.(Development Title Section 9-1015.5) <br /> 2) A minimum of eighty-three (83) parking spaces shall be provided, including four <br />