Laserfiche WebLink
i <br /> R4�!sN• . <br /> COUNTY OF SAN ;lOAQU IN THOMAS M.GAU <br /> r: <br /> DEPUTY DIRECTOR <br /> DEPARTMENT OF PUBLIC WORKS <br /> P.O.BOX 1810-1810 E.HAZELTON AVENUE MANUEL SOLORIO <br /> p• { <br /> 'INTERIM DEPUTY DIRECTOR <br /> �`,+• + STOCKTON,CALIFORNIA 95201 <br /> i �f Fain' 209)468-3000 <br /> THOMAS R. FLINN FAX(209)4158-2999 STEVEN WINKLER <br /> DIRECTORDEPUTY DIRECTOR <br /> FRED PAYTON <br /> BUSINESS ADMINISTRATOR <br /> March 18, 2002 <br /> MEMORANDUM <br /> TO: Kerry Sullivan, Deputy Director <br /> Community Development Department <br /> CONTACT PERSON: Jennifer Jolly <br /> f3LH . I�(56r� l. I <br /> Karam, Senior Civil Engineer <br /> FROM: �F-Gabriel , . <br /> - Public Services Division <br /> SUBJECT: UP-01-9 A USE PERMIT APPLICATION TO CONSTRUCT A CHURCH <br /> FACILITY (UP TO 250 MEMBERS) IN TWO PHASES. PHASE ONE TO <br /> CONTAIN A 2400 SQUARE FOOT STEEL STRUCTURE TO BE USED AS <br /> F A MULTI-PURPOSE BUILDING, PHASE TWO TO CONTAIN A 10,000 <br /> SQUARE FOOT CHURCH BUILDING. PHASE TWO TO BE COMPLETED <br /> IN FIVE:YEARS. (DISTRICT 3).. <br /> . - a <br /> APPLICANT: Central Valley Baptist Church APN: 204-020-04 <br /> INFORMATION: <br /> s. <br /> The site is not currently located within a Federal Flood Insurance Administration Designated <br /> Flood Hazard Area. <br /> Airport Way has an existing right-of-way width of 80 feet and a planned right-of-way width of <br /> 210 feet. <br /> NOTE: <br /> The Traffic Study prepared for the Central Valley Church is complete.. Therefore, Condition of <br /> Approval number 9 is no longer required.` The Traffic Study stated tht this project required no <br /> mitigation to the roadways due to the major traffic impact being at off-peak hours. All other. <br /> Conditions shall still apply. , <br /> I <br />