Laserfiche WebLink
r <br /> Storage area <br /> The storage area must have a minimum surfacing requirement of four inches aggregate <br /> base. The circulation and maneuvering areas must be paved with asphalt concrete or <br /> Portland cement concrete. These requirements have been included in the <br /> recommended Conditions of Approval. <br /> The Use Permit application has been tentatively scheduled for the Planning Commission <br /> hearing on September 17, 2009. The Community Development Department has <br /> reviewed the project and responses from other agencies, and providing any outstanding <br /> issues have been resolved, will be recommending that the Planning Commission <br /> approve the expansion subject to the following conditions of approval: <br /> Use Permit Application No. PA-0900174 was approved by the Planning Commission <br /> on . The effective date of approval is . This approval will expire on , which is 18 <br /> months from the effective date of approval, unless (1) all Conditions of Approval <br /> have been complied with, (2) all necessary building permits have been issued and <br /> remain in force, and (3) all necessary permits from other agencies have been issued <br /> and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements <br /> shall be fulfilled prior to the establishment of the use and the issuance of any <br /> building permits. Those Conditions followed by a Section Number have been <br /> identified as ordinance requirements pertinent to this application. Ordinance <br /> requirements cannot be modified, and other ordinance requirements may apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Staff Contact: Mo Hatef, 468-8477) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-GRADING BUILDING PERMIT'. <br /> The Site Plan required as a part of the grading building permit must show drainage, <br /> driveway access details including gates, on-site parking, landscaping, signs, <br /> existing and proposed utility services, and grading (refer to the"SITE PLAN CHECK <br /> LIST'for details). A fee is required for the Site Plan review. <br /> b. APPROVED USE: This approval is for a cargo yard expansion for an existing <br /> intermodal railroad facility. The 10.9-acre expansion includes the addition of 350 <br /> parking bays for cargo units and the addition of an internal access road on <br /> APN # 198-200-01. (Use Type: Major Impact Services). <br /> c. STORM DRAINAGE: Any additional storm water drainage created by new <br /> improvements shall be retained on-site. The drainage pattern and corresponding <br /> g <br /> storm drain improvements shall be shown on the Site Plan. Drainage calculations <br /> prepared by a registered civil engineer or architect shall be included. (Development <br /> Title Section 9-1135) <br /> d. ACCESS AND CIRCULATION: The following requirements apply and shall be <br /> shown on the Site Plan: <br /> 1} Access driveways shall have a width of no less than twenty-five (25) feet for <br /> two-way aisles and sixteen (16) feet for one-way aisles, except that in no case <br /> shall driveways designated as fire department access be less than twenty (20) <br /> feet wide. (Development Title Section 9-1015.5[h][1]) <br /> 2 <br />