Laserfiche WebLink
Kerry Sullivan -2- <br /> COMMENTS ON DEVELOPMENT 4 <br /> PA-04-384(UP) <br /> 4. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at <br /> the time of building permit application. (The fee currently is$1869.00 per 1000 gross square foot of <br /> building designated as Office in the Manteca area. The fee shall be automatically adjusted July 1 of each <br /> year by the Engineering-Construction Cost Index as published by the Engineering News Record. <br /> (Resolutions R-00-433) <br /> -5. A copy of the Final Site Plan shall be submitted prior,to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division(468-3066)that this development has met <br /> the requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> NOTE: Any construction activity that results in the disturbance of.at least one(1)acre of soil shall require a <br /> State NPDES construction permit. <br /> DTP:DG:ar <br /> PACOMIulMCs MYR 7.0045PA-04M84.wpd <br />