My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012711
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4800
>
2600 - Land Use Program
>
TA-00-09
>
SU0012711
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 3:46:33 PM
Creation date
9/4/2019 9:46:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012711
PE
2685
FACILITY_NAME
TA-00-09
STREET_NUMBER
4800
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
APN
17726005
ENTERED_DATE
12/23/2019 12:00:00 AM
SITE_LOCATION
4800 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\4800\TA-00-09\SPEC PP.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STOCKTON METROPOLITAN AIRPORT-SP PURPOSE PLAN SPE IC LAND USE GUIDELINEs AND STANDARDS <br /> - _ 4W. <br /> Ar <br /> •� <br /> IL <br /> 4e- Arl <br /> T .. <br /> Ar <br /> � T• •f * ' yw .. <br /> !!! f _ 1y <br /> L <br /> L�, <br /> � .., <br /> 4 Ai <br /> -, W O R K I N G C A M R V S <br /> i <br /> a. Site Planning and Setbacks <br /> Goals: Guidelines: <br /> • Develop comprehensive site planning stan- I. All building entries should have a strong visu- <br /> dards that conform to project wide design al and pedestrian connection to the street or <br /> principles,while allowing each building to an entry drive. <br /> maximize the potential of the site. <br /> • Create setbacks along the walkways and 2• Buildings should be separated from pedestri- <br /> streets that provide zones for planting and an walkways using landscape areas. <br /> pedestrian enjoyment,while engaging offices <br /> .. into the site's circulation system of pedestri- 3. Campus planned developments (more than <br /> ans, bicycles and cars. one building) should create an arrival court <br /> • Create a continuous urban fabric in which at the primary building. The arrival court <br /> buildings face the street and building entries should have a strong visual and pedestrian <br /> stand out. connection to the street by way of an entry <br /> drive. <br /> Standards: <br /> . There shall be a 27' building setback from <br /> face of curb along all streets. Front entries <br /> may be located in the setback area. <br /> WORKING CAMPUS IV 4-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.