Laserfiche WebLink
Table 1-1. Continued Page 4 of 5 <br /> Level of Level of <br /> Significance Significance <br /> before after <br /> Impact Mitigation Mitigation Measure Mitigation <br /> Impact AQ-6: Increased Ozone Precursor and PM 10 S Mitigation Measure AQ-2: Employ Trip Reduction SU <br /> Emissions Under 2015 Project(Phase 2 Interchange) Measures <br /> Conditions <br /> None available SS <br /> Impact N-1: Exposure of Noise-Sensitive Uses to Noise From LTS None required LTS <br /> Construction Activities <br /> Impact N-2: Exposure of Noise-Sensitive Land Uses to LTS None required LTS <br /> Increased Aircraft Noise <br /> Impact N-3. Exposure of Noise-Sensitive Land Uses to LTS None required LTS <br /> Increased Surface Traffic Noise Under 2015 Proposed Project <br /> (Phase 1 Interchange)Conditions <br /> Impact N-4. Exposure of Noise-Sensitive Land Uses to LTS None required LTS <br /> Increased Surface Traffic Noise Under 2015 Proposed Project <br /> (Phase 2 Interchange)Conditions <br /> Impact PS-1: Increased Demand for Law Enforcement and LTS None required LTS <br /> Airline Security <br /> Impact PS-2: Increased Demand for Fire Protection LTS None required LTS <br /> Impact PS-3: Increased Potential for Hazardous Material LTS None required LTS <br /> Spills <br /> Impact PS-4: Increased Demand for Water LTS None required LTS <br /> Impact PS-5: Increased Generation of Wastewater LTS None required LTS <br /> Impact PS-6: Increased Generation of Solid Waste LTS None required ! LTS <br /> `Impact PS-7: Increased Demand for Natural Gas -LTS None required LTS <br /> Impact PS-8: Increased Demand for Electricity LTS None required LTS <br />