My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012767
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
5000
>
2600 - Land Use Program
>
PA-02-38
>
SU0012767
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2020 2:56:30 PM
Creation date
9/4/2019 9:46:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012767
PE
2637
FACILITY_NAME
PA-02-38
STREET_NUMBER
5000
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206-
APN
17726026
ENTERED_DATE
1/2/2020 12:00:00 AM
SITE_LOCATION
5000 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\5000\PA-02-38\CDD OK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
yi' 4 STOCKTON METROPOLITAN AIRPORT SPI. YURPOSE PLAN -AIR METRO PARK ADDENDUM <br /> 3 <br /> i <br /> T <br /> I <br /> If I III <br /> N <br /> 1 <br /> CHAPTER 8 : ARCHITECTURAL CHARACTER <br /> GOALS AND OBJECTIVES <br /> The goal of the following architectural standards and These architectural standards and guidelines apply to <br /> guidelines is to ensure a cohesive, high-quality busi- all buildings proposed for the Air Metro Park devel- <br /> ness community within the Air Metro Park develop- opment area,except those buildings operated by the <br /> ment area, and continually upgrade the area as it Stockton Metropolitan Airport and the. FAA. <br /> evolves over time. The objective is to ensure that all Building projects with approvals prior to the adop- <br /> new and/or improved Air Metro Park buildings uti- tion of the Air Metro Park addendum to the <br /> lize coordinated building design and detailing,as well Stockton Metropolitan Airport Special Purpose Plan <br /> as durable, high-quality exterior materials. are not subject to these architectural guidelines. <br /> However,as these buildings are replaced,remodeled, <br /> or re-occupied by a more intensive land use, all <br /> applicable improvements will be subject to these <br /> architectural guidelines to the greatest extent possi- <br /> ble. <br /> - i <br /> t - - <br /> ARCHTEECruRAI CHARACTER 8-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.