Laserfiche WebLink
A. <br /> 11 . Please i rncl ude a :o(:y o f any sr_udi c's ( suns , a o L , Ina: ke :)G r <br /> etc. ) that you ' may have had prepared tar this pro:ect or <br /> site. <br /> C. PROJECT CHARACTERISTICS. <br /> ! 1 . Services : Indicate how the following services will be provided <br /> for your project and availability of service . <br /> a . Water Supply : Linden County Water District <br /> b. Sewage Disposal : Linden County Water District <br /> C . Storm Drainage : New Countv Service Area <br /> If an extension of any of the above is necessary , indicate <br /> which service( s ) , ' what agency will be providing the <br /> service( s ) , and the distance of the extension ( s ) : <br /> Eaten ions are necessary for sewer and wafer (which are adjacent _ <br /> _ to the 2arcel) and for stormdrain (aonroSimately 1/2 mile to <br /> are basin) i the interim retention can be provided. <br /> d . Natural Gas: PG&E <br /> e. Electricity : PG&E <br /> f . Road/Access ( i .e . , paved, unpaved, public/private, road name ) : <br /> Harrison one & Alfalfa are paved to the site' <br /> g . Fire :Linden/Peters Distance to nearest tire station: <br /> h. Schools : Linden <br /> i . Telephone: PT&T Underground <br /> 2 . Describe any site alterations which result from the proposed pro- <br /> ject (specifically address the amount and location of -grading, <br /> cuts and fills , vegetation removal , alterations to drainage, <br /> removal of existing structures , number of trees removed, etc. ) . <br /> Structures will be removed. The Moznett home will remain. Minimal <br /> grading will be done and' draina a atterns established to accommodate <br /> development. <br /> 3 . Air Quality Information: <br /> Number and type of vehicles associated with completed project <br /> 134 lots x" 1 .5 vehigle-g per lot 201 ygbinles <br /> Types of emissions and sources associated with project <br /> ut <br /> Fuel sources (and amounts ) to be consumed by or as a result of. the , <br /> completed,. project Gasoline beating <br /> ellets <br /> Will the project result in substantial air emissions or deteriora- <br /> tion of ambient air ghuality? X NO YES <br /> 4 . How much agricultural land will be ".removed from production? <br /> Irrigated 33 Ac t 4 Not irrigated_ -4 s,• + <br /> Major Subdivision - 9 - ( L/69 ) <br />