Laserfiche WebLink
I 5 <br /> Flor Ranch: Special Report <br /> WATER <br /> li the Linden County Water District. A <br /> Potable water for the project will be supplied by ty copy <br /> of the "Will Serve letters" from the District have been included in this report as Exhibit C. <br /> The project will tie into existing 18" water lines located in the Harrison Street and Ione Street <br /> alignments. <br /> Historically, the subject property has been cultivated as an orchard which required an annual <br /> water demand of 12,096.000. gallons. At the time this project is constructed the orchard will <br /> be removed thus eliminating the 'agricultural demand of water usage. <br /> Phase II of the project proposes the construction of a well site by the developer for inclusion <br /> into the water districts system. The tentative map indicates the proposed location, <br /> t I <br /> t <br /> i <br /> i <br /> i <br /> IIF <br /> i <br /> 3 <br /> w I <br />