Laserfiche WebLink
i� <br /> SJCAPCD:i <br /> MITIGATION MEASURES <br /> Page 2 <br /> i <br /> 3) ruse of petroleum-based dust palliative shall meet <br /> 1Ithe road oil requirements of the District' s Rule <br /> 409 . 5 , Cutback Asphalt Paving Materials. <br /> 4) Streets adjacent to the project site should be <br /> swept as needed to remove silt which may have <br /> accumulated from construction activities. <br /> D. At all times, ozone precursor emissions should be <br /> controlled by the following methods: <br /> 1) , All internal combustion engine driven equipment <br /> .' should be properly maintained and well tuned <br /> i' . <br /> according to manufacturer' s specifications. <br /> 2) �� During the smog season (May through October) , the <br /> construction period should be lengthened so as to <br /> minimize the number of vehicles and equipment <br /> operating at the same time. <br /> I <br /> 1 <br />