Laserfiche WebLink
F, July 6, 2007 <br /> NOA Project Number: E07096A <br /> 4.0 DISCUSSION OF NITRATE LOADING RESULTS <br /> 4.1 Total Nitrate Impact <br /> Based on the method and assumptions described, the result of the nitrate loading balance indicates <br /> that the proposed development on the proposed project should not cause a build up of nitrate in the <br /> ground water above 10 mg/L-N over the long term. <br /> 4.2 Methods of Mitigation <br /> Because of the favorable result of the nitrate loading calculation, no mitigation measures are (26.2J <br /> warranted. <br /> 5.0 CONCLUSIONS AND RECOMMENDATIONS <br /> Our office concludes that the proposed project will not cause a build up of nitrates above 10 <br /> mg/L-N in the ground water. We recommend the EHD guidelines be followed for the construction <br /> of a standard septic system. <br /> h j <br /> 6.0 LIMITATIONS <br /> Our professional services were performed, our findings obtained, and our conclusions proposed in <br /> j accordance with generally accepted engineering principles and practices. This warranty is in lieu of (j J <br /> all other warranties either expressed or implied. Test findings and statements of professional <br /> opinion do not constitute a guarantee or warranty, expressed or implied. <br /> .NEIL O.ANDERSON&ASSOC., INC. <br /> 6 Na cy R. er,B.A. David Welch,Principal Geologist <br /> Sta f Scientist CEG-2151, CHG-653,PGP-1049 �ar� <br /> Fi <br /> gx\QNAL <br /> o <br /> a� DAVID J.WLI <br /> NO.2151 <br /> CERTIN 1) <br /> ENGINEERING <br /> S GEOLOGIST P <br /> `OFCA�IFo <br /> P7 <br /> F <br />