My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012168
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ARATA
>
7116
>
2600 - Land Use Program
>
PA-1900010
>
SU0012168
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:40 AM
Creation date
9/4/2019 9:54:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012168
PE
2622
FACILITY_NAME
PA-1900010
STREET_NUMBER
7116
Direction
E
STREET_NAME
ARATA
STREET_TYPE
RD
City
STOCKTON
Zip
95215-
APN
10113057
ENTERED_DATE
1/29/2019 12:00:00 AM
SITE_LOCATION
7116 E ARATA RD
RECEIVED_DATE
2/7/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\ARATA\7116\PA-1900010\SU0012168\APPL.PDF \MIGRATIONS\A\ARATA\7116\PA-1900010\SU0012168\CDD OK.PDF \MIGRATIONS\A\ARATA\7116\PA-1900010\SU0012168\EHD COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
31SJCOG , Inc . <br /> S JC0G, Inc. <br /> San Joaquin County Multi-Species Habitat Conservation dam'Open Space Plan <br /> 555 East Weber Avenue•Stockton,CA 95202• (209)235-0600 • FAX(209)235-0438 <br /> SJMSCP HOLD <br /> Ila TO: Local Jurisdiction: Community Development Department Planning Department Building <br /> Department Engineering Department Survey Department Transportation Department <br /> Other: <br /> FROM: Laurel Boyd, SJCOG, Inc. <br /> DO NOT AUTHORIZE SITE DISTURBANCE <br /> DO NOT ISSUE A BUILDING PERMIT <br /> DO NOT ISSUE FOR THIS PROJECT <br /> The landowner/developer for this site has requested coverage pursuant to the San Joaquin County Multi- <br /> Species Habitat Conservation and Open Space Plan (SJMSCP). In accordance with that agreement,the <br /> Applicant has agreed to: <br /> 1) SJMSCP Incidental Take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take Minimisation Measures(ITMMs)will be issued to the project and must be signed by the <br /> project applicant prior to any ground disturbance but no later than six(6)months from receipt of the ITMMs. <br /> If ITMMs are not signed within six months,the applicant must reapply for SJMSCP Coverage. Upon receipt <br /> of signed ITMMs from project applicant,SJCOG,Inc.staff will sign the ITMMs. This is the effective date <br /> of the ITMMs. <br /> 2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs. <br /> 3. Upon issuance of fully executed ITMMs and prior to any ground disturbance,the project applicant must: <br /> a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage <br /> being covered(the bond should be valid for no longer than a 6 month period);or <br /> b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered;or <br /> - c. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> d. Purchase approved mitigation bank credits. <br /> 4. Within 6 months from the effective date of the ITMMs or issuance of a building permit,whichever occurs <br /> fust,the project applicant must: <br /> P•' a. Pay the appropriate SJMSCP for the entirety of the project acreage being covered;or <br /> pp b. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> J c. Purchase approved mitigation bank credits. <br /> Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called. <br /> t <br /> Project Title, PA-1900010(MS) <br /> Landowner: Richard &Frances Bozzano Applicant: Dillon &Murphy <br /> Assessor Parcel#s: 101-130-57 <br /> T , R , Section(s): <br /> Local Jurisdiction Contact: Giuseppe Sanfilippo <br /> The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate <br /> Incidental Take Minimization Measures are properly implemented and monitored and that <br /> appropriate fees are paid in compliance with the SJMSCP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.