Laserfiche WebLink
APPLICATION- -SITE APPROVAL <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> ..... ..... ... <br /> NVISONMENTAI- INFORMATION <br /> �A6DMONAL PAXV <br /> ........... <br /> M, <br /> ,:waist,a <br /> Describe any areae subject so nooding (include Food depths and flood panel map number): <br /> Flood A-21, flood depth 11' <br /> Describe the current depth oil the ground venter and depth to potable wafer. <br /> Depth of ground water is 20' . Potable water is between 80' to 300' deep. <br /> Describe any axis-ting drainage courses or eroded areas on or new the project she (e.g. rivers, creeks or drainage ditchat): <br /> There are inustrial waste ponds north and east of the location. <br /> Mot ......... <br /> Describe the she's topography (e.g. [and forms, slopes. etc.): <br /> Flat, graveled location. This location is part of Holly Sugar Plant. <br /> Do-scribe agricultural land that will be lost as a result of t1w project (type of crops, acres, quality of soli, etc.): <br /> None <br /> Describe arty wildlife habitat on-aha and spocias that are of may be peasant: <br /> None <br /> Describe any vagetation on-afte by typo and extent <br /> None <br /> . .......... ...................... ..... <br /> ............ <br /> Ntcrib-e air pollutants that may result from the project (e.g. oonstructim related dust vehicle trips por day,fire placoa, Incinerators, <br /> etc.): The duration of the olLeration is estimated at 45 days. A drilling rig will <br /> used. The drilling riS will be pgxnred by diesel engines. , There will be <br /> around 20 vehicle trips per 24 hours during the drilling operatioli. <br /> ...................... <br /> Other <br /> ........... .................... <br /> .. . ...... . .. ................. <br /> ...... ... ....... .. <br /> ........ ....... ........... <br /> Describe arty hems of hL-rto6ctd of archaeological interest or)-she (e.g. cemeteries or structures): <br /> 1:6ne <br /> Describe " on-she or off-ahe sources of hoise, or vlbfaUon (e.g.ffoeway noise, heavy 6quipmoK etc.), <br /> During the drilling operation, the drilling rig will produce noise and vibration. <br /> gas wells are not noisy.. <br /> Describe any on-site or off-afte sources of light of glara (e.g. parking lot lighting, or reflective materials used): <br /> During the drilling operation, there will be flood lights around the rig. <br /> Describe any on-aha_or-off-site e-ourou_of odor(a.-gTagricu:tursd-vv&st"): <br /> None. Natural gas is odorless. <br /> Doscribe any displacement of popple that will be caused by the project (a,g. numbers of people, housing units): <br /> None <br />