Laserfiche WebLink
2. Mitigation Implementation and Monitoring Program Arch-Sperry Specific Road Plan <br /> F€ndingsl Approving <br /> Responsible <br /> Approving Product/ Significance staff/or Timing Mlilgation Measures <br /> Agency Body Action After Completion <br /> - Mitigation Date <br /> EARTH RESOURCES <br /> Impact: Proiect construction could result in Increased soil <br /> SPW Director Prior to IS-1. Erosion and Sediment Control Plana During the final project design Erosion and 1, NS <br /> approval of phase, an,erosion>and<sedimentation control plan shall be prepared. Sediment <br /> improvement The plan shall contafn�englneedng design and construction measures Control Plans Ratiorialp: <br /> plans to avoid or minimize the potential for soil eroslon and subsequent IS page 3Q <br /> sedimentation of streams. v1 <br /> Impact: The road structure could be affected by soil subsidence. <br /> SPW Director Prior to IS-2. Geotechnical'§tudK."A`geotechnical report shall be prepared.,during Geotechnical 1, NS <br /> approval of the final project;design, phase. ,The report shall specify conditions to Reports <br /> Improvement ensure that,:.the'''road".lmprovements will withstand the effects of Rationale: <br /> plans anticipated,regional; subsidence, The City of Stockton and San IS page 28 <br /> Joaquin CoOnty. shall-'-be, responsible for ensuring the specified <br /> measures are Implernented,during project construction. <br /> WATER RESOURCES <br /> Impact: The proposed roadwa could potentiall be sub*t to floodirt '` <br /> SPW and Directors Prior to IS-3. Drainage Facliity S eciflcatlons. Specifications for curbs, gutters and Final drainage 1, NS <br /> SJCPW approval of other drainage..facilities shall be.developed during the final project plans <br /> improvement design phase, and;shaft be.in accordance with applicable City, County Rationale: <br /> plans and Caltrans standards. The City of Stockton and San Joaquin County IS pages 29- <br /> shall be. responsible. ;for ensuring the specified measures are 30 <br /> Implemented during project construction. <br /> rh <br /> 1 `fix <br /> 7G <br /> . Itg, CA <br />