My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011952
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ARCH
>
3568
>
2600 - Land Use Program
>
PA-1800210, -11
>
SU0011952
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:33 AM
Creation date
9/4/2019 9:55:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011952
PE
2687
FACILITY_NAME
PA-1800210, -11
STREET_NUMBER
3568
Direction
E
STREET_NAME
ARCH
STREET_TYPE
RD
City
STOCKTON
Zip
95215-
APN
18112001
ENTERED_DATE
9/19/2018 12:00:00 AM
SITE_LOCATION
3568 E ARCH RD
RECEIVED_DATE
9/17/2018 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\ARCH\3568\PA-1800210, -11\SU0011952\APPL.PDF \MIGRATIONS\A\ARCH\3568\PA-1800210, -11\SU0011952\EHD COND.PDF \MIGRATIONS\A\ARCH\3568\PA-1800210, -11\SU0011952\MISC.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
opo IN PLAN APPLICATION/AMENDMENT <br /> APPLICABLE TO • COUNTY GENERAL PLAN <br /> ` • MASTER PLANS <br /> • PUBLIC FINANCING PLANS <br /> 4 CiFOR�\P <br /> • SPECIFIC PLANS <br /> • SPECIAL PURPOSE PLANS <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> 1810 E. HAZELTON AVENUE, STOCKTON CA 95205 <br /> BUSINESS PHONE: (209)468-3121 <br /> Business Hours: 8:00 a.m. to 5:00 p.m. (Monday through Friday) <br /> APPLICATION PROCESSING STEPS <br /> STEP 1 CHECK WITH STAFF-Development Services Staff will explain the requirements and procedures to you. <br /> STEP 2 PREAPPLICATION CONFERENCE A Preapplication Conference will be required for new plans prior to submittal <br /> and may be required for some amendments. Staff will advise you as to which parts of the application must be submitted <br /> prior to the Prea plication Conference. <br /> STEP 3 SUBMIT YOUR APPLICATION When you apply, file all of the following: <br /> • FEE The staff will let you know the current cost of filing an application. Make checks payable to the San <br /> Joaquin County Treasurer. <br /> • FORMS Ten(10)copies of the completed application information forms(attached)which all owners/applicants must <br /> sign. <br /> MAP If a map is to be amended or added. Ten (10)copies. <br /> • NITRATE LOADING/ If the proposed method of sewage disposal is on-site, and this is permissible,submit a Nitrate Loading/ <br /> SOILS SUITABILITY Soil Suitability Study prepared to the specifications of the Environmental Health Division.. Submit this <br /> STUDY study to the Environmental Health Division prior to submitting this application. <br /> • TEXT CHANGE If the text of a plan is to be amended. Seven(7)copies. <br /> • DEED If applicable, one copy of the recorded deed(s)of the property. <br /> General Plan Amendment Applications may require compliance with County Water Policy-see Dept. of Public Works <br /> STEP 4 APPLICATION PROCESSING —Staff will check your application. If anything is missing, you will be <br /> notified in writing. The applicant will be sent a postcard once the application has been determined <br /> complete. (your application cannot be processed until it is complete.) <br /> • CEQA The County will decide if the proposal will have an adverse effect on the environment. If there are no adverse <br /> effects,the application will be processed. If there are potential adverse effects,further environmental review will <br /> be required. Projects that have the potential to adversely affect the environment will require the preparation of <br /> an E.I.R. This may extend the processing time. <br /> • REFERRALS Staff will refer the application to any County departments, other agencies and surrounding property owners <br /> AND ACTION (for a map amendment)affected by your proposal. At the end of a review and comment period a staff report will <br /> be prepared and the Planning Commission will hold a public hearing. At the conclusion of the hearing the <br /> Commission will either refer the application to the Board of Supervisors will a favorable recommendation or deny <br /> the request. The Board of Supervisors will then hold a public hearing and take final action on your request. <br /> (Note: Planning Commission denials must be appealed in order to be heard by the Board of Supervisors.) <br /> STEP 5 PERMITS <br /> • LAND USE Subdivisions and some specific land uses will require permits,which may require an additional public hearing. <br /> PERMITS <br /> • SANITATION & Projects that will utilize new on-site sanitation disposal and/or on-site wells, must get permits from the <br /> WELL PERMITS Environmental Health Division. <br /> • BUSINESS If the project involves a business, a Business License must be approved prior to starting operation. <br /> LICENSES <br /> • BUILDING If the project involves construction, a building permit must be approved prior to commencement of work. <br /> PERMITS <br /> • OTHER Frequently other local, state and/or federal agencies will require permits prior to new uses being established <br /> PERMITS (e.g.Air Pollution Control District, Regional Water Quality Control Board or the Sheriffs Office). The Community <br /> Development Department will identify additional permits we are aware of that may be required for your project. <br /> FIDEVSVOPlanning Application Foms\ Page 1 of 7 <br /> Plan Application Amendment.doc.(Revised 05-11-09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.