Laserfiche WebLink
)�Pqulk c0 � 1 <br /> ;.. .y COUNTY OF SAN JOAQUIN THOMAS R.FLINN <br /> DEPARTMENT OF PUBLIC WORKS DEPUTY DIRECTOR <br /> R O. BOX 1810-1810 E. HAZELTON AVENUE <br /> �d�icoR'p STOCKTON,CALIFORNIA 95201 THOMAS M.GAU <br /> (209)488-3000 DEPUTY DIRECTOR <br /> MANUEL LOPEZ FAX(209)488-2999 <br /> DIRECTOR � <br /> 'E"+1/;, r- STEVEN WINKLER <br /> MAY ' DEPUTY DIRECTOR <br /> May 9, 2001 `'U�i ?001 <br /> U1 rrtj,u <br /> MEMORANDUM <br /> TO: Kerry Sullivan, Deputy Director <br /> Community Development Department <br /> CONTACT PERSON: Leanne Mueller <br /> FROM: ��Gabriel Karam, Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT: SA-01-35 A SITE APPROVAL APPLICATION FOR A LANDSCAPE <br /> SERVICE IN AN EXISTING BUILDING. (DISTRICT 4). <br /> APPLICANT: Patrick & Joanne Fisher APN: 061.080-21 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration <br /> Designated Flood Hazard Area. <br /> Armstrong Road has an existing right-of-way width which varies and a planned <br /> right-of-way width of 60 feet. <br /> RECOMMENDATIONS: <br /> 1. An encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. The driveway approach shall be improved in accordance with the requirements of <br /> San Joaquin County Standards R-17 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee will be required for this development. The fee is <br /> due and payable at the time of building permit application. (The fee currently is <br /> $162.51 per daily trip-end generated in the Lodi area. The fee shall be <br /> automatically adjusted July 1 of each year by the Engineering Construction Cost <br /> Index as published by the Engineering News Record. <br /> (Resolutions 00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building <br /> permit. <br /> 5. Verification shall be obtained from the Solid Waste Division (468-3066) that this <br /> development has met the requirements of the Waste Plan Format for <br /> Development Projects. Final Site Plan is required upon submittal of verification. <br /> GK-.BN:mr <br /> PSAE038-MIC <br />