My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004857 SSCRPT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ARNAUDO
>
175
>
2600 - Land Use Program
>
PA-0400737
>
SU0004857 SSCRPT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2019 2:52:56 PM
Creation date
9/4/2019 9:55:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSCRPT
RECORD_ID
SU0004857
PE
2611
FACILITY_NAME
PA-0400737
STREET_NUMBER
175
Direction
W
STREET_NAME
ARNAUDO
STREET_TYPE
BLVD
City
MOUNTAIN HOUSE
APN
NUMEROUS
ENTERED_DATE
2/22/2005 12:00:00 AM
SITE_LOCATION
175 W ARNAUDO BLVD
RECEIVED_DATE
2/22/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\A\ARNAUDO\175\PA-0400737\SU0004857\SSC RPT.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> CONDOR EARTH TECHNOLOGIES INC <br /> 188 Frank West Circle Suite I <br /> _ Stockton CA 95206 <br /> Phone 209.234.0518 <br /> C O N O RFAX 209.234.0538 <br /> www.condorearth.com <br /> Y w.condorearth.com <br /> January 20, 2005 <br /> Mike Huggins <br /> San Joaquin County <br /> Environmental Health Department <br /> 304 E. Weber Ave, Third Floor <br /> Stockton, CA 95202 <br /> Subject: Mountain House,Neighborhood G <br /> Abandon Arnaudo Bros.#1 Gas Well <br /> Condor Project No.4125114 <br /> Dear Mr.Huggins: <br /> r <br /> Condor has reviewed the documents (attached) from the Resources Agency of California, Department of <br /> Conservation, Division of Oil and Gas (DOG) regarding the Arnaudo Bros. #1 gas well installed by the <br /> �.. Union Oil Company of California (Unocal) on Assessor's Parcel Number 209-040-15 as shown on <br /> Figure 1, attached. The well as mapped is slightly north of the planned Mountain House Neighborhood G <br /> subdivision. It is our understanding, based on the attached records, that UNOCAL drilled the Arnaudo <br /> + Bros. #1 gas well, consisting of one boring with three casings to depths of 50, 960, and 3999 feet below <br /> existing ground surface in early to middle part of 1988 under a Permit to Conduct Well Operations <br /> approved by the DOG. The dry well sanded up when the perforating guns were run on the production <br /> + string. UNOCAL applied to abandon the well in July of 1988, approved by the DOG, and completed, <br /> including restoring the site to the original condition, in September 1988. The dry well was cemented <br /> from 2856 to 2221 feet, 860 to 580 feet, and 63 feet to ground surface and mudded between those <br /> ` intervals. The well casing was removed to five feet below ground surface with a steel cap welded to the <br /> top of casing. The abandonment and restoration was approved in a letter dated May 24, 1989 written by <br /> Robert Reid of the DOG to UNOCAL, attached. <br /> The site is currently being developed by Trimark Communities as part of the Mountain House <br /> Development. Chapter 6, Section 6.8.4, Implementation, Section A of the Mountain House New <br /> Community Master Plan, 1994, attached, states that gas wells within 500 feet of the project should be <br /> �+ mapped and a report prepared "so that the County can determine if the County's procedures for well <br /> abandonment and remediation have been followed." Condor submits this letter and the attached <br /> documents containing the approval letter from the DOG for your review and approval of the past <br /> r abandonment of the Amaudo Bros. #1 gas well to San Joaquin County standards for well abandonment. <br /> Condor contacted the DOG for pre-construction recommendations on new construction over or near <br /> i4 previously abandoned gas wells. The DOG recommended following the procedures outlined in their <br /> Construction-Site Review Program, attached to ensure that an abandoned gas well meets the Division's <br /> r <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.