My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007861
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
2600 - Land Use Program
>
PA-0800105
>
SU0007861
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2020 11:37:03 AM
Creation date
9/4/2019 10:03:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007861
PE
2675
FACILITY_NAME
PA-0800105
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
APN
20106003
ENTERED_DATE
8/11/2009 12:00:00 AM
SITE_LOCATION
9999 S AUSTIN RD
RECEIVED_DATE
7/24/2009 12:00:00 AM
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\A\AUSTIN\9999\EIR PA-0800105\NOP.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
687
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Draft Supplemental Environmental Impact Report <br /> Forward Inc. Landfill 2014 Expansion Project <br /> LIST OF TABLES <br /> 11-1. Summary of Impacts and Mitigation Measures II-4 <br /> III.0-1.Summary of Existing Site Subareas 111-11 <br /> III.0-2. Existing Permits: Forward Landfill III-33 <br /> IV.B-1. Level of Service Descriptions, Signalized Intersections IV.B-4 _ <br /> IV.13-2. Level of Service Descriptions, Unsignalized Intersections IV.13-5 <br /> IV.13-3. Level of Service Descriptions, Two-Way Segments IV.B-5 <br /> IV.B-4 Existing Peak Hour Intersection Operations IV.B-9 <br /> IV.B-5 Existing Plus Project Peak Hour Intersection Operations IV.13-15 <br /> IV.13-6. Roadway Segment Analysis Austin Road from Arch Road to — <br /> Project Site Driveway IV.B-17 <br /> IV.B-7. Maximum Truck Volumes and Queues at Landfill Entrance IV.B-18 _ <br /> IV.B-8. Trip Generation For Approved Projects IV.B-20 <br /> IV.B-9. Existing Plus Approved Projects Peak Hour Intersection Operations IV.B-24 <br /> IV.B-10. Existing Plus Approved Projects Plus Project Peak-Hour <br /> Intersection Operations IV.B-25 <br /> IV.B-11. 2035 Conditions Without the Proposed Project Peak-Hour <br /> Intersection Operations IV.B-29 <br /> IV.B-12. 2035 Cumulative Conditions Peak-Hour Intersection Operations IV.B-32 <br /> IV.B-13. Austin Road (Arch Road to Project Site Driveway) Roadway Segment <br /> Analysis—Near-Term EPAP Scenario IV.B-38 <br /> IV.13-14. Austin Road (Arch Road to Project Site Driveway) Roadway Segment <br /> Analysis—Cumulative 2035 Scenarios IV.13-39 <br /> IV.0-1. Typical Noise Levels IV.0-1 <br /> IV.0-2. Maximum Allowable Noise Exposure IV.0-3 <br /> IV.0-3. Existing Noise Environment In the Project Area IV.0-6 <br /> IV.0-4. Existing and Projected Traffic Noise Levels Along Roadways In the <br /> Project Vicinity (Ldn) IV.0-10 <br /> IV.D-1. State and National Criteria Air Pollutant Standards, Effects, and Sources IV.D-5 <br /> IV.D-2 Air Quality Data Summary (2009-2013) for the Project Area IV.D-13 <br /> IV.D-3. Maximum Construction Criteria Pollutant Emissions (tons per year) IV.D-16 _ <br /> IV.D-4. Project Net Criteria Pollutant Emissions (tons per year) IV.D-18 <br /> IV.D-5. Odor and Dust Survey Observations—Existing Operations IV.D-21 <br /> IV.D-6. GHG Emissions (metric tons equivalent CO2 per year) IV.D-25 <br /> IV.E-1. Summary of Key Landfill Operation Assumptions IV.E-6 <br /> IV.F-1. Special-Status Animal Species Recorded from Project Region IV.F-7 — <br /> iv <br />
The URL can be used to link to this page
Your browser does not support the video tag.