Laserfiche WebLink
t r V _ V r r r r - r - r U I f r r <br /> Draft Supplemental Environmental Impact Report Page II-19 <br /> Forward Inc. Landfill 2014 Expansion Project <br /> public, or the equipment for personal heath and safety. <br /> environment. <br /> • Landfill access will continue to be controlled to limit unauthorized entry by <br /> persons or vehicles. <br /> • The landfill operator will comply with all provisions of CCR,Title 27, <br /> Division 2, Chapter 3,Subchapter 4, Articles 1-3 that apply to landfill health <br /> and safety. <br /> Identified in This EIR: <br /> Mitigation Measure E.3. The San Joaquin County Public Works Department shall <br /> approve any new waste transport haul routes to the landfill from major arterials, SR <br /> 4,or Highway 99. <br /> E.4. Additional landfill Proposed as Part of the Project: Less than <br /> gas would be generated, • Where required by State and Federal regulations, the landfill gas monitoring, Significant <br /> thus increasing the gas control and collection system will be installed, extending to the new <br /> potential for landfill gas areas of the expanding landfill and operating in conformance with applicable <br /> hazards. regulations. <br /> • The existing gas extraction system,or an equivalent system, will continue to <br /> operate. <br /> • Regular gas monitoring will be conducted to prevent explosive or toxic gas <br /> accumulation in onsite buildings or beneath temporary buildings. The <br /> landfill operator will install an automatic combustible gas detection and <br /> alarm system for structures at the site. <br /> • The landfill operator will not construct or otherwise locate any structure in <br /> an area of known landfill gas build-up. <br /> • All site personnel who work in permanent structures will be trained to use <br /> and respond to the landfill gas monitoring and alarm system. <br />