My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007861
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
2600 - Land Use Program
>
PA-0800105
>
SU0007861
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2020 11:37:03 AM
Creation date
9/4/2019 10:03:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007861
PE
2675
FACILITY_NAME
PA-0800105
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
APN
20106003
ENTERED_DATE
8/11/2009 12:00:00 AM
SITE_LOCATION
9999 S AUSTIN RD
RECEIVED_DATE
7/24/2009 12:00:00 AM
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\A\AUSTIN\9999\EIR PA-0800105\NOP.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
687
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Draft Supplemental Environmental Impact Report Page II-32 <br /> Forward Inc. Landfill 2014 Expansion Project <br /> water prior to dewatering and destroying the pre-existing aquatic habitat. In <br /> addition,non-predatory fish species that exist in the aquatic habitat and <br /> which are to be relocated shall be seined and transported to the new aquatic <br /> habitat as the old site is dewatered. <br /> 7. If wetlands, irrigation ditches, marshes, etc. will not be relocated in the <br /> vicinity, then the aquatic habitat shall be dewatered at least two weeks prior <br /> to commencing construction. <br /> S. Pre-construction surveys for the giant garter snake (conducted after <br /> completion of environmental reviews and prior to ground disturbance) shall <br /> occur within 24 hours of ground disturbance. <br /> 9. Other provisions of the USFWS Standard Avoidance and Minimization Measures <br /> during Construction Activities in Giant Garter Snake Habitat shall be <br /> implemented (excluding programmatic mitigation ratios which are <br /> superseded by the SJMSCP's mitigation ratios). <br /> H-4. Potential "Take" of Mitigation Measure HA. . Participation in the SJMSCP affords the project Less than <br /> Western Pond Turtle. proponent Incidental Take authorization for Pacific pond turtle pursuant to ESA, Significant <br /> CESA and CEQA. Nonetheless, to minimize the potential for incidental take of the <br /> species,preconstruction surveys for western pond turtles shall be conducted within <br /> the project study area by a qualified biologist approved by the SJMSCP TAC. If the <br /> species is detected, within the study area, the project shall undertake Incidental Take <br /> Avoidance and Minimization Measures to protect the species as directed by the <br /> TAC. Avoidance and minimization measures may include the following, as <br /> specified by the TAC: <br /> 1) When nesting areas for pond turtles are identified on a project site, a buffer <br /> area of 300 feet shall be established between the nesting site (which may be <br /> immediately adjacent to wetlands or extend up to 400 feet away from <br /> wetland areas in uplands) and the wetland located near the nesting site. <br /> These buffers shall be indicated by temporary fencing if construction has <br /> begun or will begin before nesting periods end (the period from egg laying <br /> to emergence of hatchlings is normally April to November). The buffer <br /> zones shall be maintained until the nesting season has ended. <br />
The URL can be used to link to this page
Your browser does not support the video tag.