Laserfiche WebLink
r r - V - . i - r V_ r r r r r r r. r r r r r r <br /> Draft Supplemental Environmental Impact Report Page II-41 <br /> Forward Inc.Landfill 2014 Expansion Project <br /> protection. suppression measures at the proposed expanded landfill to the Lathrop- <br /> Manteca Fire District. <br /> • Existing fire protection facilities will be maintained (see also <br /> Impact/Mitigation E.1). <br /> I.3. The extended length Proposed as Part of the Project: Less than <br /> of operations due to the Significant <br /> proposed expanded The project sponsor will continue to apply, to the entire consolidated landfill, <br /> landfill could adversely the safety procedures currently employed at the existing Forward Landfill <br /> affect the Manteca- and described in the Workplace Injury and Illness Prevention Plan. The <br /> Lathrop Fire District's project sponsor will furnish information regarding proposed disposal <br /> ability to provide operations and safety procedures at the Austin Road Landfill, and the <br /> emergency medical proposed consolidated landfill, to the Manteca-Lathrop Fire District. <br /> service. <br /> • Monthly inspections of all facilities for safety will be conducted in <br /> accordance with the Safety Checklist prepared by the National Solid Waste <br /> Management Association (NSWMA) or other checklist of equivalent scope <br /> and detail. <br /> • Safety meetings with employees will be conducted to disseminate safety <br /> information,in accordance with procedures described in the JTD. <br /> • Personal protective gear will be provided for the safe handling of solid <br /> waste, as described in the JTD. <br /> I.4. The proposed project Proposed as Part of the Project. Less than <br /> could extend the time for Significant <br /> leachate generation that, If leachate is delivered to the City of Stockton Regional Wastewater Control <br /> if disposed at the City of Facility,the project sponsor will provide for independently corroborated test <br /> Stockton Regional results to the City to demonstrate the chemical composition of the leachate <br /> Wastewater Control extracted from the proposed consolidated landfill project. Monitoring and <br /> Facility, could adversely testing of landfill-generated leachate will meet the requirements of the City <br /> affect plant operation. of Stockton Wastewater Ordinance and the City Municipal Utilities <br /> Department. <br />