Laserfiche WebLink
• <br /> • <br /> Draft Supplemental Environmental Impact Report Page I-2 • <br /> Forward Inc. Landfill 2018 Expansion Project • <br /> • Increase the remaining landfill capacity by approximately 32.0 million cubic yards <br /> (cy) to approximately 54.0 million cubic yards (cy). All of the increase would be Class <br /> II landfill space and would extend the landfill closure date to approximately 20391. • <br /> • Relocate approximately 3,000 feet of the South Fork of South Littlejohn Creek(which <br /> currently traverses the landfill) to the southeastern boundaries of the site to provide • <br /> additional separation of the creek from the landfill. The relocated creek will be ap- • <br /> proximately 3,200 feet in length. • <br /> • Allow cannery waste processing in areas of site that are not being used for disposal at • <br /> the time. • <br /> The Board of Supervisors certified the Forward Landfill Expansion Final Environmental Im- • <br /> pact Report however the project application required an override to the Airport Land Use • <br /> Plan by the County Board of Supervisors, which was not approved. <br /> In 2014, Forward proposed a smaller increase in permitted landfilling capacity that did not <br /> include the previously proposed expansion of landfilling operation on the 184-acre Brocchi- <br /> ni parcel. This proposed increase in landfill acreage was entirely within the boundary of the • <br /> 567-acres permitted under the current land use permit (UP-00-0007/ER-00-0002) approved • <br /> by the Board of Supervisors on April 8, 2003. A Draft Supplemental FIR (DSEIR) was circu- • <br /> lated for this proposed expansion in December 2014 and comment were received, but For- • <br /> ward abandoned the project before the Final Supplemental FIR was completed. <br /> The 2018 Expansion Project described in this Supplemental EIR is very similar to the 2014 <br /> proposal. It has a smaller increase in permitted landfilling capacity that does not include the • <br /> any expansion of landfilling operations onto the Brocchini parcel. The additional proposed • <br /> landfill acreage is entirely within the boundary of the 567-acres permitted under the current • <br /> land use permit (UP-00-0007/ER-00-0002) approved by the Board of Supervisors on April 8, • <br /> 2003. <br /> The 2018 Expansion Project would make the following changes to the currently permitted <br /> landfill: <br /> • Landfilling of an 8.7-acre parcel in the northeast portion of the site within the current- <br /> ly permitted landfill boundary. • <br /> • Landfilling of approximately 8.6 acres in the south area • <br /> • The south area expansion would require realigning about 2,900 feet of the South Fork • <br /> of South Littlejohn Creek to a 3,300-foot alignment along the southern and eastern • <br /> boundaries of the site, along with a new bridge across the creek. <br /> • The expansion would increase total landfill capacity by up to 8.420 million cubic <br /> yards beyond currently permitted levels, which would increase the remaining Class <br /> • <br /> • <br /> 'The 2013 FHIR estimated closure dates with and without that project of 2039 and 2021,respectively. However,2014 estimated closure dates <br /> with and without the 2012(previously proposed)project are 2045 and 2026,respectively. <br /> • <br /> • <br /> • <br /> • <br />