Laserfiche WebLink
• Draft Supplemental Environmental Impact Report Page I-5 <br /> • Forward Inc. Landfill 2018 Expansion Project <br /> E. USES OF THIS SUPPLEMENTAL EIR <br /> • This document is a project-level Supplemental EIR for the 2018 Forward Landfill Expansion <br /> • Project. Its primary use is to provide CEQA-compliant review of any substantive changes to <br /> the proposed project, existing conditions, impacts, or mitigation measures identified in the <br /> 2013 EIR that have been identified since certification of the 2013 EIR. <br /> Under CEQA, a responsible agency is an agency other than the lead agency that has a legal <br /> responsibility for carrying out or approving a project or elements of a project (Public <br /> Resource Code [PRC] Section 21069). Responsible agencies are encouraged to actively <br /> • participate in the CEQA process of the lead agency, review the CEQA documents of the lead <br /> • agencies, and use the documents when making decisions on the project. Possible CEQA <br /> responsible agencies for components of this project that are proposed to change include: <br /> • U.S. Army Corps of Engineers(USACE) <br /> • California Department of Resources Recycling and Recovery (CalRecycle) <br /> • California Department of Water Resources <br /> • Central Valley Flood Protection Board <br /> • San Joaquin County Environmental Health Department <br /> • San Joaquin County Department of Public Works <br /> • San Joaquin County Flood Control and Water Conservation District <br /> • • California Department of Fish and Wildlife <br /> • • Central Valley Regional Water Quality Control Board <br /> • • San Joaquin Valley Unified Air Pollution Control District <br /> • Manteca-Lathrop Fire Department <br /> Specific permits and approvals required from these agencies, as well as federal agency <br /> . permits and approvals, are listed in III. Project Description. <br /> F. REPORT ORGANIZATION <br /> • This Supplemental EIR is organized into the following chapters: <br /> • Chapter 1 — Introduction: Discusses the overall purpose of the Supplemental EIR; summa- <br /> rizes the organization of the document; discusses the function of a Supplemental EIR as de- <br /> scribed in the CEQA Guidelines. <br /> Chapter 2 — Summary: summarizes the original and revised Project, and any changes in im- <br /> pacts that would result from implementation of the 2018 Expansion Project. <br /> Chapter 3—Project Description: Provides background information about the Project, includ- <br /> ing the Project's environmental review history; existing conditions at the Project site; the ob- <br /> jectives and physical characteristics of the Project; and changes to the entitlements that <br /> • would be required as part of the Project. <br /> • Chapter 4— Supplemental Environmental Setting, Impacts, and Mitigation Measures: This <br /> • chapter, which constitutes the updated environmental analysis of the proposed Project, de- <br /> scribes existing conditions, and evaluates the potential effects of the Project as they relate to <br />