Draft Supplemental Environmental Impact Report Page 11-14 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> C.3. Chi-Site Landfill Mitigation Measure C.3. Two options exist to mitigate the project's potentially Less than <br /> Equipment Noise significant impact from equipment operations, as follows: Significant <br /> (a)Heavy equipment operations shall not be conducted within 1,500 feet of any <br /> occupied residence after 10 p.m. and before 7 a.m.;or <br /> (b) Equipment operations within 1,500 feet of any residence after 10 p.m. or before 7 <br /> a.m. shall be fully shielded from the direct line of sight to the residence by an <br /> earthen berm whose crown elevation exceeds the elevation of the top of the exhaust <br /> stack. <br /> CA. Cumulative Traffic Significant and Unavoidable. No feasible mitigation measures are available to Significant and <br /> Noise Impacts reduce the project's contribution to cumulative noise impacts. Unavoidable <br /> D. AIR <br /> QUALITY/ODORS/ <br /> CLIMATE CHANGE <br /> Mitigation Measure D.1. The applicant shall comply with Regulation VIII Rule Less than <br /> D.1. Initial construction 8011 and implement the following control measures during construction: Significant <br /> particulate matter <br /> (PM10) and equipment • The applicant shall submit a Dust Control Plan subject to review and approval <br /> exhaust emissions. of the SJVAPCD at least 30 days prior to the start of any construction activity <br /> on a site that includes 5 acres or more of disturbed surface area. <br /> Specific relevant control measures for construction, excavation, extraction, and other <br /> earthmoving activities required by the SJVAPCD include: <br /> • All disturbed areas, including storage piles not actively utilized for <br /> construction purposes, shall be effectively stabilized using water, chemical <br /> • � r � � i � � � � � 000400000000000000 * 0 * 00000000 . 00 • <br />