Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page II-26 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> F.3. Groundwater Proposed as Part of the Project. Less than <br /> contamination would Significant <br /> result if the leachate A double liner would be installed under the sump area, as previously <br /> collection systems for the required by the RWQCB; <br /> expansion areas fail. <br /> • The liner and leachate collection system for the two new expansion areas <br /> would have new a leachate management system.The adequacy of the <br /> leachate collection system and associated monitoring would be reviewed and <br /> approved by the RWQCB; <br /> • The regulatory required separation between the liner and groundwater shall <br /> be implemented to allow for chemicals in the leachate to attenuate before <br /> reaching the groundwater, should the leachate breach the liner and leachate <br /> collection system; <br /> • Electric testing of the liner in each WMU shall be conducted before waste can <br /> be disposed in that Unit, as required by the RWQCB; <br /> • If any modifications to the leachate collection system and associated <br /> monitoring are required by the RWQCB, the landfill operator shall <br /> implement those changes; <br /> • The liner system will be overlain by a protective operations layer consisting <br /> of a one-foot thickness of soil and a one-foot thick gravel layer that serves as <br /> the leachate collection layer. This two-foot layer will serve to protect the liner <br /> system from sharp or jagged materials in the waste. <br /> • The operator will remove any hazardous materials spotted during delivery, <br /> thus minimizing the potential for leachate impacts to groundwater if a break <br /> occurs in the liner or the leachate collection system. <br /> • Landfill operations and maintenance are designed with adequate lifetimes to <br /> identify and correct any failures in the leachate collections stem. <br />