Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page II-30 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> sedimentation during the specifications and standard construction BMPs during the construction phase of the Significant <br /> construction phase of the South Branch of Sough Littlejohns Creek realignment. Construction of the realigned <br /> relocation of the South creek channel shall be implemented during the dry season. <br /> Branch of South This would reduce potential impact of sedimentation from the proposed creek <br /> Littlejohns Creek. alignment to a less-than-significant level. <br /> F.9. The expansion of the Less than significant. None required. Less than <br /> landfill would result in Significant <br /> the removal of existing <br /> groundwater monitoring <br /> wells. <br /> G. SOILS AND <br /> GEOLOGY <br /> G.1. Seismic shaking Proposed as Part of the Project. Less than <br /> could impair or Significant <br /> otherwise compromise The project sponsor has prepared a seismicity study for the site, with details <br /> both the existing and in Appendix D of the Geotechnical Investigation Report (Geo-Logic, 2008a, <br /> proposed (for the new 2008b) and the Geosyntec (1999) report. If the potential maximum peak <br /> expansion areas)Class II ground acceleration in the seismicity study is greater than that assumed in <br /> liner and associated the preliminary design, the final project design analysis will make <br /> leachate collection modifications needed to meet the factor of safety (determinations may be <br /> system integrity, causing subject to the approval of the CalRecycle and/or RWQCB). Impacts to the <br /> slope instability, damage new liner and drainage system installed will be monitored as appropriate <br /> to drainage features, or based on any stipulations of the CalRecycle and/or RWQCB. <br /> differential settlement of <br /> the landfill over the life <br /> of the project, or <br /> following closure. <br />