Laserfiche WebLink
• <br /> Draft Supplemental Environmental Impact Report Page 1II-28 • <br /> Forward Inc. Landfill 2018 Expansion Project <br /> • <br /> The on-site water wells and a water storage tank provide water for fire suppression. The well at • <br /> the entrance facilities area has a 1,500-gpm pump that feeds four valved connection points along • <br /> the northern perimeter of the existing Forward Landfill. The well at the transfer station/materials <br /> recovery facility has a 500-gallon-per-minute (gpm) pump that feeds a 20,000-gallon pressurized • <br /> tank. Lines from the tank lead to various locations. • <br /> To reduce the risk of fire,preprocessed treated automobile shredder waste(PTASW) is disposed <br /> rather than stored for extend periods. If suppression of burning PTASW is needed,stockpiled soil • <br /> would be used to cover and smother the burning PTASW. <br /> Security • <br /> • <br /> All areas and facilities,other than those expressly designated for use by haulers,are considered • <br /> restricted areas. Security fences surrounding the site limit landfill access by unauthorized persons. <br /> Gatehouse personnel control access through the landfill entrance. The entrance to the site has a • <br /> lockable gate and is locked outside of usual operating hours. <br /> • <br /> Closure and Postclosure • <br /> A Preliminary Closure and Postclosure Maintenance Plan has been prepared for the currently <br /> permitted Forward Landfill. The anticipated closure date for the existing Forward Landfill is in <br /> 2030. The current postciosure land use for the landfill is non-irrigated open space. • <br /> • <br /> Environmental Control and Monitoring Program • <br /> Surface Water and Erosion Control • <br /> • <br /> The surface water control plan for the existing Forward Landfill consists of an integrated system of • <br /> bench ditches,perimeter channels,and storm water retention basins. The final landfill is designed • <br /> so that surface water would run off via sheet flow until it is intercepted by a bench ditch. Bench <br /> ditches subsequently drain toward downdrains, which discharge to perimeter channels. Finally, • <br /> the perimeter channels drain to the sedimentation/detention basin. • <br /> As required by the site's Waste Discharge Requirements(WDRs) issued by the Central Valley • <br /> Regional Water Quality Control Board,permanent storm water runoff and drainage control • <br /> facilities for the existing Forward Landfill have been designed to convey peak discharge resulting <br /> from 1,000-year,24-hour storm event runoff volumes. The storm water and drainage facilities of • <br /> the proposed landfill expansion would be designed for the 1,000-year storm event. The drainage • <br /> network for the completed landfill is designed to carry stone water at velocities that would <br /> minimize ditch erosion. • <br /> • <br /> Currently, all landfill surface water is routed to one of three sedimentation/detention basins. Two • <br /> sedimentation basins are located in the southwest corner of the site,on either side of the South • <br /> Fork. The basin located north of the South Fork collects runoff from the landfill area in the <br /> southern portion of the site,and the basin located south of the South Fork collects runoff from the • <br /> • <br /> • <br /> • <br /> • <br /> • <br />