My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011836
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
2600 - Land Use Program
>
PA-1800090
>
SU0011836
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 10:35:38 AM
Creation date
9/4/2019 10:04:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011836
PE
2656
FACILITY_NAME
PA-1800090
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336-
APN
20106003, -05, 18115007, -16
ENTERED_DATE
6/26/2018 12:00:00 AM
SITE_LOCATION
9999 S AUSTIN RD
RECEIVED_DATE
8/15/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\APPL.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\EHD COND.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\DRAFT SEIR-09-2018.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\EIR-07-2018.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Draft Supplemental Environmental Impact Report Page IV.A-29 <br /> Forward Inc.Landfill 2018 Expansion Project <br /> Mitigation Measure A.S. Shield Landfill Lighting. (Same As 2013 EIR Mitigation A.5): The <br /> project sponsor shall include downward shielding of new landfill lighting, and shall abide by <br /> any reasonable and feasible measures or regulations the Federal Aviation Administration (FAA) <br /> • and Stockton Metropolitan Airport have to mitigate lighting impacts that could be cause by the <br /> • proposed project, including reducing or eliminating lighting during foggy conditions and <br /> concurrently suspending operations that depend on the lighting. <br /> a <br /> The Conditions of Approval for the proposed project shall include the requirement that the <br /> • project sponsor,prior to construction, file a Notice of Proposed Construction or Alteration <br /> • (Form 7460-1) with the Federal Aviation Administration. <br /> Mitigation Measure K4 (2013 EIR) also applies to night lighting impacts. <br /> • Impact A.6: Potential conflicts with nearby land uses (Revises 2013 EIR Impact A.6). Because <br /> ` the existing Forward Landfill is currently in operation and there are no sensitive residential <br /> receptors near the major proposed expansion area, it is not anticipated that the proposed <br /> landfill expansion project would generate significant new land use conflicts with the existing <br /> • adjacent and nearby land uses. The recently constructed California Health Care Facility <br /> • (located west of Austin Road between the Forward Landfill and Arch Road), the recently <br /> constructed Northern California Re-Entry Facility and renovation of the adjacent Dewitt-Nelson <br /> Youth Correctional Facility (both located on the south side of Arch Road between Austin and <br /> • Newcastle Roads), the approved Arch Road Industrial Project (located on the south side of Arch <br /> • Road between Austin and Newcastle Roads, west of the Northern California Re-Entry Facility), <br /> the approved Archtown Industrial Project, at the southwest corner of Arch and Newcastle <br /> Roads, and the approved and partially constructed NorCal Logistics Center(formerly known as <br /> "Opus Logistics Center") (located northwest of the intersection of Arch and Austin Roads) (see <br /> Surrounding and Nearby Land Uses, above) all consist or would consist of non-residential uses, <br /> . which are not incompatible with the proposed project. The approved Tidewater Crossing <br /> residential project, located west of Highway 99 and north of French Camp Road, adjacent to the <br /> Stockton Metropolitan Airport, is approximately one mile west of the project site. The western <br /> • portion of the existing Forward Landfill is closer to Tidewater Crossing than are the two <br /> portions of the proposed 2018 expansion project. Therefore, the 2018 Expansion Project would <br /> 40 <br /> • not create any significant land use conflicts with these future land uses. <br /> IR The Project could create conflicts with the Stockton Metropolitan Airport due to the potential of <br /> • the expansion to attract birds that may pose an aircraft hazard. As discussed in Surrounding <br /> • and Nearby Land Uses, the landfill's bird control program has been effective at preventing gulls <br /> from feeding at, or otherwise using,the Forward Landfill. (Davis, 2017). Mitigation Measure <br /> AA, above, stipulates continuation of this gull control program, as well as implementation of <br /> • appropriate control measures recommended by USDA Wildlife Services. As discussed under <br /> • Impact A.3, above,the 2018 Expansion Project would comply with the Federal Aviation <br /> • Regulation Part 77 height restrictions for structures in the vicinity, requirements for notification <br /> of the airport and FAA, and requirements that the project sponsor demonstrate that the project <br /> would not pose a bird hazard to aircraft. Therefore, the proposed landfill expansion would not <br /> increase land use conflicts with the airport and the impact would be less-than-significant. <br />
The URL can be used to link to this page
Your browser does not support the video tag.