Laserfiche WebLink
• <br /> • Draft Supplemental Environmental Impact Report Page IV.B-10 <br /> • Forward Inc. Landfill 2018 Expansion Project <br /> factor of 1 truck vs.2 passenger cars (PCE). The final daily trip generation for the Project evaluated <br /> in the study is 1,600 passenger car trips. Table 4 shows a summary of Project trip generation <br /> estimates. <br /> Table IV.B-5: Forward Landfill "Project"Trip Generation Estimates <br /> AM Peak Hour Trips PM Peak Hour Trips Daily Trips <br /> • Inbound Outbound Inbound Outbound Inbound Outbound <br /> 108 132 70 106 800 800 <br /> Note: <br /> . The above trip estimates were determined based on the maximum permitted daily <br /> truckloads minus current daily truck count.Peak-hour trips were determined based on <br /> • turning movement counts conducted at Forward landfill main access driveway.The above <br /> • trips are passenger equivalent trips. <br /> Project Trip Distribution Assumptions <br /> • The directional distribution of the project traffic, which identifies the potential routes of travel, <br /> . was estimated based on examinations of the study area street layout, land use, current <br /> circulation patterns and traffic volumes, along with consultation from County staff. Figure <br /> IV.13-3 shows the estimated directional Project traffic distribution. <br /> Impact B.1. Potential Project Impact to LOS at Nearby Intersections. (Revises 2013 EIR <br /> • Impact B.1) <br /> Intersection Analysis <br /> This section of this traffic study describes conditions that would exist under Existing-Plus- <br /> Project conditions. Comparing Existing-Plus-Project conditions to the no project conditions <br /> • results in an identification of project-related impacts. Table IV.B-6 shows traffic LOS for the <br /> existing-plus-project condition. Figure IV.B-4 shows existing-plus-project traffic volumes. <br /> As shown in the table and figure, all of the study intersections currently operate at <br /> acceptable conditions and would continue to operate at acceptable conditions LOS "C" or <br /> • better with the Project. Therefore, the Project's impact to intersection LOS would be less <br /> • than significant. <br />