Laserfiche WebLink
• <br /> Draft Supplemental Environmental Impact Report Page IV.B-25 • <br /> Forward Inc. Landfill 2018 Expansion Project <br /> • <br /> • <br /> Cumulative Impacts to Austin Road Mainline Segment • <br /> • <br /> The Norcal Logistics Center project is expected to add about 1,000 daily trips (570 of its total • <br /> estimated site generated trips) to Austin Road according to its traffic study estimates. This • <br /> makes a total of about 4,700 daily vehicle trips on Austin Road in the short-term scenario, well <br /> below the recommended design capacities for either collector streets or minor arterial streets. • <br /> • <br /> There are no available 2035 traffic forecasts for Austin Road. As much of land along the study • <br /> segment near the Project site is agricultural land,not much is expected to happen that will • <br /> significantly change the current traffic patterns. Assuming an annual 17o growth rate for the <br /> next 15 years, the daily volumes would be about 5,500 vehicles per day and would be well • <br /> within the LOS "C"standard as shown in the following San Joaquin County's General Plan • <br /> Road Classifications and corresponding capacities. Therefore this impact would be less than • <br /> significant. <br /> • <br /> Impact B.9. Potential Cumulative Impacts at Main Access Driveway. (Revises 2013 EIR • <br /> Impact B.9) • <br /> As shown in Table IV.B-12,under cumulative conditions, the landfill driveway with the project • <br /> would continue to operate at a satisfactory level of service. For these reasons, the Expansion • <br /> Project would not affect queuing on Austin Road before the landfill is opened in the morning. • <br /> This impact would be less than significant and no mitigation would be required. • <br /> Impact B.10. Potential Cumulative Impacts on Bicycles. (Revises 2013 EIR Impact B.10) • <br /> • <br /> As described in Setting, Bicycles, above, French Camp Road is a proposed Class III bikeway. • <br /> The 2013 EIR found that the previously proposed project would add a maximum of 19 truck • <br /> trips in each direction in the AM Peak Hour to French Camp Road. The truck volume would be <br /> lower in other hours. This volume of trucks would not be a considerable contribution to • <br /> cumulative impacts on bicycle usage and facilities;thus, the project's cumulative impact would • <br /> be less than significant. • <br /> The 2013 EIR also found that additional Forward Landfill truck traffic outside the study area • <br /> may overlap with bikeways or bicycle usage,but that the added trips would disperse to many • <br /> roadways outside the study area, and it is not expected that the landfill-related vehicles on any • <br /> individual roadway would create a significant negative impact. Therefore,the previously • <br /> proposed project would not make a considerable contribution to cumulative impacts on bicycle <br /> usage and facilities under both cumulative scenarios (near-term and year 2035). The 2018 • <br /> update of the transportation study found that the analysis of cumulative impacts on bicycles • <br /> under EPAP conditions the previously proposed project, above, also would apply to the 2018 • <br /> Expansion Project. For these reasons, under Near-Term Cumulative Conditions and Year 2035 • <br /> Cumulative Conditions, the impacts of the 2018 Expansion Project would be less than <br /> significant and no mitigation would be required. • <br /> • <br /> • <br /> • <br /> • <br /> • <br />