Laserfiche WebLink
• <br /> • <br /> Draft Supplemental Environmental Impact Report Page IV.G-2 <br /> • Forward Inc. Landfill 2018 Expansion Project <br /> Impaired waters are those that do not meet water quality standards, even after point sources of <br /> pollution have installed the required levels of pollution control technology. The law requires <br /> that these jurisdictions establish priority rankings for waterways on the impaired list and <br /> • develop action plans to improve water quality. This process includes development of Total <br /> • Maximum Daily Loads(TMDLs)that set waste load allocations for point sources and load <br /> allocations for non-point source pollutants. The Ducheny Bill (Assembly Bill (AB) 1740) requires <br /> the State Water Resources Control Board (WRCB)and its nine RWQCBs to post this list and <br /> provide an estimated completion date for each TMDL. <br /> National Polluant Discharge Elimination System. Part of the Clean Water Act provides for the <br /> National Pollutant Discharge Elimination System(NPDES), in which discharges into navigable <br /> waters are prohibited except in compliance with specified requirements and authorizations. <br /> • Under this system, municipal and industrial facilities are required to obtain a NPDES permit <br /> • that specifies allowable limits, based on available wastewater treatment technologies, for <br /> pollutant levels in their effluent. In California, the EPA has delegated the implementation of this <br /> program to the WRCB and geographically designated RWQCB. The Forward Landfill currently <br /> • has a NPDES permit to discharge the treated groundwater from their groundwater extraction <br /> • and treatment system that is overseen by the Central Valley RWQCB. Additional information <br /> about the treated groundwater and its reuse at Forward Landfill is discussed in subsections <br /> below. <br /> Stormwater discharges are regulated somewhat differently. Stormwater runoff from <br /> construction areas of one acre or greater requires either an individual permit or coverage under <br /> the statewide General Construction Stormwater Permit. <br /> Federal Emergency Management Agency (FEMA) <br /> FEMA is an agency of the United States government that provides a single point of <br /> accountability for all federal emergency preparedness and mitigation and response activities. <br /> • On March 1, 2003, FEMA became part of the U.S.Department of Homeland Security. The <br /> primary mission of FEMA is to reduce the loss of life and property and protect the nation from <br /> all hazards, including natural disasters, acts of terrorism, and other man-made disasters,by <br /> leading and supporting a risk-based comprehensive emergency management system of <br /> • preparedness, protection, response, recovery, and mitigation. <br /> FEMA's National Flood Insurance Program (NFIP) is intended to encourage State and local <br /> governments to adopt responsible floodplain management programs and flood measures. As <br /> • part of the program,the NFIP defines floodplain and floodway boundaries that are shown on <br /> • Flood Insurance Rate Maps (FIRMS). <br /> State and Regional Agencies and Regulations <br /> • The WRCB and the RWQCB's share the responsibility under the Porter-Cologne Act to <br /> formulate and adopt water policies and plans and to adopt and implement measures to fulfill <br /> the Clean Water Act requirements. In the project site vicinity, the Regional Water Quality Control <br /> • Plan for the Central Valley Region 5A(Central Valley RWQCB, 2016) serves to protect water <br />