Laserfiche WebLink
• <br /> • <br /> • Draft Supplemental Environmental Impact Report Page IV.H-4 <br /> • Forward Inc. Landfill 2018 Expansion Project <br /> • services and infrastructure,increased traffic and noise, and conversion of agricultural and <br /> • open space to development use. Inducement of disorderly growth that is inconsistent <br /> with local land use plans generally causes significant environmental impacts. <br /> If the proposed landfill expansion would stimulate growth into the area, then the project <br /> • would have growth inducing impacts. However, the 2018 Expansion Project, which <br /> would be smaller than the previously proposed expansion,involves neither the extension <br /> of public service, such as water or sewer lines, nor the creation of a land use that would <br /> stimulate adjacent development, the 2018 Expansion Project is not likely to have growth- <br /> inducing impacts. <br /> • It should also be noted that construction and extended operation period of the 2018 <br /> • Expansion Project would, because of the resulting environmental impacts, make the <br /> Project area less desirable for development. However, this effect would be smaller than <br /> • for the previously proposed expansion. <br /> The 2018 Expansion Project would be considered growth inducing if, by providing <br /> additional disposal capacity,the landfill would encourage development in the area. There <br /> • is no evidence that available waste disposal capacity is limiting development in the areas <br /> • that would be served by the Forward Landfill. <br /> Cumulative Impacts <br /> In evaluating potential environmental impacts, CEQA requires that the project be <br /> considered within the context of regional development. While the environmental effects <br /> resulting from an individual project may appear less than significant when considered <br /> . alone,they may be significant when added to impacts caused by other projects in the area. <br /> • Cumulative impacts are defined by CEQA Guidelines Section 15355 as "two or more <br /> individual effects which, when considered together, are considerable, or which <br /> • compound or increase other environmental impacts." <br /> The cumulative impacts analyses in this document are made on the basis of lists of past, <br /> present, and reasonably anticipated future projects, as well as projections of growth that <br /> • encompass both specific development and other regional growth (for example, in B. <br /> • Transportation and Circulation). <br /> • Previously Approved Projects <br /> The 2013 EIR identified four projects in the vicinity of the project site that had been <br /> approved but not yet developed at that time: <br /> • Arch Road Industrial Project, located on the south side of Arch Road between <br /> Austin and Newcastle Roads. The project consists of light industrial and <br /> • warehouse uses on a 63-acre site. This project has been constructed so is part of <br /> • the cumulative development scenario. <br /> • Archtown Industrial Project, located on an approximately 70-acre site at the <br /> • southwest comer of Arch and Newcastle Roads. The project consists of light <br /> • <br /> • <br /> • <br /> • <br /> • <br />