Laserfiche WebLink
• <br /> Draft Supplemental Environmental Impact Report Page V-1 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> V.ALTERNATIVES • <br /> A. INTRODUCTION • <br /> • <br /> Section 15126(d) of the California Environmental Quality Act (CEQA) Guidelines <br /> requires that an FIR describe a range of reasonable alternatives to the proposed project, • <br /> or to the location of the project, which could feasibly attain most of the basic project • <br /> objectives but would avoid or substantially lessen any of the significant environmental <br /> effects of the project. Chapter V. Alternatives in the 2013 FIR included a summary of the <br /> project objectives and described and evaluated the potential impacts of a full range of <br /> alternatives to the previously proposed project. That chapter also described alternatives • <br /> considered but not studied further. Alternatives considered in the 2013 EIR included: <br /> • Alternative 1: No Project Alternative • <br /> • Alternative 2A: Reduced Project Alternative • <br /> • Alternative 213: Reduced-Size/Reduced Daily Operations Alternative • <br /> • Alternative 3: Expansion of North County Recycling Center and Sanitary Landfill • <br /> The currently proposed Expansion Project is another alternative to the project evaluated <br /> in the 2013 EIR. As described in this SEIR, the 2018 Expansion Project would have <br /> reduced impacts compared with all of the previously considered alternatives other than • <br /> the no-project alternative. <br /> However, alternatives to the implementation of the 2018 Expansion Project are available. • <br /> These involve implementing only one of the two fill sites proposed under the Expansion • <br /> Project and/or not increasing the daily fill rates beyond current levels. The impacts of <br /> these three alternatives are compared with the currently proposed project below. • <br /> B. ADDITIONAL ALTERNATIVES CONSIDERED IN THIS SUPPLEMENTAL EIR <br /> Alternative 4: Northern Fill Area Only <br /> Under this Alternative, the Northern fill area would be filled with about 3.3 million • <br /> cubic yards of wastes, about 4117o of that proposed under the 2018 Expansion Project. • <br /> This alternative would include the existing permitted maximum truck trips (620/day) <br /> through the life of the project, with a closure date of 2033 rather than 2036 for the <br /> proposed project. Because the South site would not be developed as a landfill under this • <br /> alternative, no creek relocation or new access driveway/bridge would be required, and • <br /> the existing composting facility would remain. <br /> As with the Proposed Project and Alternative 2A, the expanded landfill would accept <br /> both Class Il (designated) and Class III (municipal) waste. Other than the changes <br /> described above, this alternative would have the same facilities and operating • <br /> procedures (other than hours of operation) as the proposed project. <br /> Impacts of this alternative would be similar to those of the proposed project except for <br /> the following: <br /> • <br />