• <br /> • <br /> Draft Supplemental Environmental Impact Report Page V-3 • <br /> Forward Inc. Landfill 2018 Expansion Project <br /> C. OTHER ALTERNATIVES CONSIDERED AND REJECTED IN THIS SEIR . <br /> An additional alternative, an out-of-county landfill, was requested to be considered in <br /> comments on the 2014 Draft SEIR. This alternative was rejected from further <br /> consideration in this SEIR as discussed below. <br /> Out-of-County Alternative <br /> The County does not have jurisdiction to approve any landfill outside of its jurisdiction, ' <br /> therefore such an alternative would be not be feasible for the lead agency to implement, • <br /> which is one of CEQA's criteria for considering alternatives (per CEQA Guidelines <br /> Section 15126.6(f)(1). In addition, even though much of the refuse accepted at Forward <br /> comes from outside of the County, given the distribution of Class II landfills in the <br /> region, the Forward facility may be the nearest facility for much of the out-of-county • <br /> waste that it accepts. With a relocated, out of county landfill, some wastes would be <br /> hauled for shorter distances while other wastes would be hauled farther. Therefore, <br /> depending on its location, an out-of-county alternative may not significantly reduce <br /> traffic, noise, or air quality impacts compared with the proposed project. In addition, <br /> establishing a new landfill, with all related construction and operational activities, • <br /> typically requires more land and has greater environmental impacts than infilling an <br /> existing landfill. <br /> Other Off-Site Alternatives <br /> The 2013 FIR and this SEIR do not consider specific off-site landfill sites (other than the i <br /> possible expansion of two County landfills) in detail because a new landfill would, by • <br /> necessity, require a substantially larger land area and substantially greater ancillary <br /> facilities than would an expansion of an existing landfill. Specifically, a new landfill <br /> would require an operations center, weighing station, truck washing facilities, new • <br /> access and internal circulation roads, a new composting facility, new materials sorting <br /> areas, new equipment storage areas, new cover excavation areas, new buffer areas, <br /> possible new utility extensions/expansions, possible traffic control infrastructure, and <br /> other new facilities essential to constructing and operating a landfill that already exist at <br /> existing landfills. <br /> The need for space for these facilities and buffers increase the space requirements for a <br /> new landfill, which is why the 2013 EIR assumed the need a 500-acre minimum parcel <br /> size, even if the actual landfill footprint were similar to the proposed project expansion • <br /> footprint. For example, the Keller Canyon Landfill in Contra Costa County, permitted in • <br /> 1992, had a disposal area of 244 acres but a total site area of 2628 acres (CalRecycle, Solid <br /> Waste Facility Permit, Keller Canyon Landfill, Permit #07-AA-0032). San Joaquin <br /> County's Foothill Landfill has a disposal acreage of 750 acres and a total site area of 800 • <br /> acres (CalRecycle, Solid Waste Facility Permit, Foothill Sanitary Landfill, Permit #39- <br /> AA-0004). The North County Landfill does have a smaller area, 320 acres with a 185- • <br /> acre waste footprint (CalRecycle, Solid Waste Facility Permit, North County Landfill, <br /> Permit #39-AA-0022). However, recently permitted new landfills tend to be larger, for <br /> example the Mesquite Regional Landfill in Southern California has a landfill footprint of • <br />