My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011836
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
2600 - Land Use Program
>
PA-1800090
>
SU0011836
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 10:35:38 AM
Creation date
9/4/2019 10:04:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011836
PE
2656
FACILITY_NAME
PA-1800090
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336-
APN
20106003, -05, 18115007, -16
ENTERED_DATE
6/26/2018 12:00:00 AM
SITE_LOCATION
9999 S AUSTIN RD
RECEIVED_DATE
8/15/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\APPL.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\EHD COND.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\DRAFT SEIR-09-2018.PDF \MIGRATIONS\A\AUSTIN\9999\PA-1800090\SU0011836\EIR-07-2018.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Draft Supplemental Environmental Impact Report Page IV.A-29 <br /> Forward Inc.Landfill 2018 Expansion Project <br /> notified CalRecycle that the demonstration was placed in the operating record by letter <br /> on July 6,2018. (Basso,2018d,Basso,2018e). <br /> • The use of highly reflective surface materials in constructing structures on the site will <br /> be prohibited. <br /> In addition,the following Mitigation Measure (from the 2002 Final EIR for the existing landfill), <br /> which is a condition of the permits for the existing landfill, shall be implemented: <br /> Mitigation Measure A.S. Shield Landfill Lighting. (Same As 2013 EIR Mitigation A.5):The <br /> project sponsor shall include downward shielding of new landfill lighting, and shall abide by <br /> any reasonable and feasible measures or regulations the Federal Aviation Administration(FAA) <br /> and Stockton Metropolitan Airport have to mitigate lighting impacts that could be cause by the <br /> proposed project, including reducing or eliminating lighting during foggy conditions and <br /> concurrently suspending operations that depend on the lighting. <br /> The Conditions of Approval for the proposed project shall include the requirement that the <br /> project sponsor,prior to construction, file a Notice of Proposed Construction or Alteration <br /> (Form 7460-1)with the Federal Aviation Administration. Forward has already filed this form <br /> for the proposed project(Lewis, pers. com,August 8,2018). This form shall be re-filed if there is <br /> any change to proposed landfill grade. <br /> Mitigation Measure K.4 (2013 EIR) also applies to night lighting impacts. <br /> Significance After Mitigation: <br /> Implementation of the procedures proposed as part of the project, identified above,and <br /> Mitigation Measure A.S,would reduce lighting impacts to a less-than-significant level. <br /> Impact A.6: Potential conflicts with nearby land uses (Revises 2013 EIR Impact A.6). Because <br /> the existing Forward Landfill is currently in operation and there are no sensitive residential <br /> receptors near the major proposed expansion area, it is not anticipated that the proposed <br /> landfill expansion project would generate significant new land use conflicts with the existing <br /> adjacent and nearby land uses. The recently constructed California Health Care Facility <br /> (located west of Austin Road between the Forward Landfill and Arch Road),the recently <br /> constructed Northern California Re-Entry Facility and renovation of the adjacent Dewitt-Nelson <br /> Youth Correctional Facility(both located on the south side of Arch Road between Austin and <br /> Newcastle Roads),the approved Arch Road Industrial Project(located on the south side of Arch <br /> Road between Austin and Newcastle Roads,west of the Northern California Re-Entry Facility), <br /> the approved Archtown Industrial Project, at the southwest corner of Arch and Newcastle <br /> Roads, and the approved and partially constructed NorCal Logistics Center(formerly known as <br /> "Opus Logistics Center") (located northwest of the intersection of Arch and Austin Roads) (see <br /> Surrounding and Nearby Land Uses, above)all consist or would consist of non-residential uses, <br /> which are not incompatible with the proposed project. The approved Tidewater Crossing <br /> residential project, located west of Highway 99 and north of French Camp Road, adjacent to the <br /> Stockton Metropolitan Airport, is approximately one mile west of the project site.The western <br /> portion of the existing Forward Landfill is closer to Tidewater Crossing than are the two <br /> portions of the proposed 2018 expansion project. Therefore,the 2018 Expansion Project would <br />
The URL can be used to link to this page
Your browser does not support the video tag.