Laserfiche WebLink
a f <br /> SAN 10AQUIN Environmental Health Department <br /> COUNTY Jasjit Kang, REHS, Director <br /> Muniappa Naidu, REHS,Assistant Director <br /> �gcrFOR��P Greatness grows here. PROGRAM COORDINATORS <br /> Jeff Carruesco, REHS, RDI <br /> Willy Ng, REHS <br /> Steven Shih, REHS <br /> EMAILED Michelle Henry, REHS <br /> } PP Elena Manzo,REHS <br /> 18 January 2023 /- Q4• Q.13 ® Natalia Subbotnikova,REHS <br /> To: San Joaquin County Community Development Department <br /> Attention: Stephanie Stowers <br /> From: Aaron Gooderham (209) 616-3062 00L <br /> Senior Registered Environmental Health Specialist <br /> RE: PA-1800090 (UP, RAA), Early Consultation, S00011836 <br /> 9999 S. Austin Road, Manteca <br /> The following requirements have been identified as pertinent to this project. Other <br /> requirements may also apply. These requirements cannot be modified. <br /> 1. Submit application to revise Solid Waste Facility Permit (SWIS 39-AA-0015) and <br /> Reports of Facility Information (RFI) 180 days prior to implementing propose changes. <br /> 2. Applicant shall contact Natalia Subbotnikova, Program Coordinator, Small Public Water <br /> System Program, at (209) 468-0338, to determine if the existing well can be permitted <br /> as a public water system prior to issuance of building permits. If a public water system is <br /> required, applicant shall submit a Small Public Water System preliminary technical <br /> report to the California State Water Resources Control Board, Division of Drinking <br /> Water (Water Board) at least six months before initiating construction of any water <br /> related improvement, as defined. The issuance of a permit to operate a small public <br /> water system by the local primacy agency (EHD) is prohibited without the concurrence <br /> of the Water Board. Please contact Brian Kidwell, P.E. with the SWRCB Division of <br /> Drinking Water at (209) 948-3963 concerning the requirements for preliminary technical <br /> report submittal prior to issuance of building permits. <br /> If the Water Board determines that an onsite well shall be used as the potable water <br /> source, a permit application to operate Small Public Water System shall be submitted to <br /> the EHD for approval prior to issuance of building permits. To issue a permit to operate, <br /> concurrence from the Water Board is required. A yearly permit to operate a public water <br /> system will be required by the EHD prior to sign off of the certificate of final occupancy <br /> (San Joaquin County Development Title, Section 9-602.010 and 9-601.030.). <br /> The supplier must possess adequate financial, managerial, and technical capability to <br /> assure delivery of pure, wholesome, and potable drinking water in accordance with San <br /> Joaquin County Development Title, Sections 9-602.010 and 9-601.030 and C.C.R., Title <br /> 22, and Health and Safety Code, Section 116525 116570. <br /> 3. Any geotechnical drilling shall be conducted under permit and inspection by The <br /> Environmental Health Department (San Joaquin County Development Title, Section 9- <br /> 1115.3 and 9-1115.6). <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/ehd <br />