Laserfiche WebLink
r <br /> Draft Supplemental Environmental Impact Report Page IV.G-16 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> As part of the proposed expansion,WMU F-North would be clean closed and a new leachate <br /> evaporation pond would be constructed in the southwest corner of the expansion area.An <br /> additional leachate evaporation pond would be constructed in the current entrance facility area. <br /> Required leachate monitoring consists of dam-weekly inspections of the system and sumps for <br /> the presence of leachate. If leachate is present, the sumps are pumped and the leachate is <br /> disposed. Leachate detected in a previously dry sump is sampled and that sump is added to the <br /> semi-annual sampling program.The leachate samples are analyzed for the constituents and <br /> parameters listed in the site's WDRs, and include the field parameters discussed in the surface <br /> water monitoring.The quantity and quality of leachate pumped from each sump is measured <br /> and reported to the RWQCB in gallons per day. <br /> Monitoring devices are also in place beneath the sumps of the leachate collection system to <br /> detect if there is leakage through the leachate collection system.These pan lysimeter monitoring <br /> devices are sampled and tested for constituents of concern, including VOCs, as required by the <br /> RWQCB. <br /> rImpacts and Mitigation <br /> Standards of Significance <br /> According to CEQA Guidelines, the proposed project could have a significant impact with <br /> regard to hydrology and water quality if it would: <br /> • Substantially degrade water quality; <br /> • Contaminate a public water supply; <br /> • Substantially degrade or deplete groundwater resources; <br /> • Substantially interfere with groundwater recharge; <br /> • Cause flooding or subject structures to flood hazards; <br /> r Substantially modify a local or regional drainage feature (i.e., creek alignment); <br /> • Cause significant erosion or sedimentation; <br /> r • Generate more leachate than can be handle by the existing or planned control systems;or <br /> • Cause or be subject to substantial flooding,erosion, or siltation. <br /> As described in the Project Description, State and Federal standards have been established for <br /> the siting, design, construction, operation, closure, and post-closure of Class II landfills. <br /> Similarly,the closed Class I landfill has post-closure monitoring and maintenance requirements. <br /> These standards incorporate state-of-the-art engineering requirements that are intended to <br /> reduce the risks associated with waste disposal facilities to an acceptable level. An inconsistency <br /> between the proposed project and regulations related to surface or groundwater hydrology and <br /> water quality also would have the potential to result in significant impacts. <br /> r <br /> r <br /> r <br />