Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page IV.G-18 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> Mitigation Measure G.1:None required. <br /> Impact G.2: If erosion from soil stockpiles and landfill surfaces are not properly controlled, <br /> or inadvertent spills of refuse or other substances onsite occurred,surface water could <br /> potentially become contaminated. <br /> If erosion from stockpiles and landfill refuse were not properly controlled,this could create <br /> sedimentation in Littlejohns Creek and cause contaminants in the refuse to migrate in the <br /> surface water and be deposited downstream.Wet Weather Plans and Erosion Control Plans <br /> have historically been in place at the Forward Landfill to protect against such uncontrolled <br /> erosion and sedimentation. No new regulatory issues have been identified with regard to <br /> management of this erosion potential. <br /> The following procedures are proposed as part of the proposed expansion project: <br /> • The current drainage control structures and monitoring would continue to be implemented <br /> to control erosion and sedimentation in the expansion areas.Proposed structural controls <br /> include the drainage control system and daily cover. Operational controls include <br /> maintenance of the drainage system by keeping ditches clear of debris and excessive <br /> vegetation, and making needed repairs to drainage structures. Corrective measures would <br /> be implemented if inspections show excessive erosion or damage to drainage channels. Any <br /> areas showing erosive effects would be mitigated by removing loose debris followed by <br /> replacement, regrading, and compacting the area.Monitoring and protection against <br /> sediment from entering the Littlejohns Creek channel would be implemented, including the <br /> diversion of part of Littlejohns Creek farther away from the landfilled area. <br /> • In order to minimize sediment transport to Littlejohns Creek, landfill slopes, ridgetops, and <br /> peripheral areas would be revegetated to inhibit erosion. <br /> Implementation of these procedures would reduce the impact to a less-than-significant level. <br /> Mitigation Measure G.2:None required. <br /> Impact G.3:Potential groundwater impacts could result if the proposed liners and leachate <br /> collection systems for the Landfill expansion areas were not properly designed or installed, <br /> or if they were to fail. <br /> Without a properly designed landfill cell liner and LCRS installed in the project expansion <br /> areas, landfill leachate could percolate through the ground underlying the landfill units and <br /> potentially contaminate groundwater. To address this potential,the expansion areas would <br /> have a leachate collection system installed that will meet the federal and state Class II landfill <br /> design requirements. <br /> The following groundwater quality protection measures are proposed as part of the project: (as <br /> required under CCR Title 27) <br /> • A pan lysimeter(secondary liner)would be installed under the sump area, as previously <br /> required by the RWQCB; <br />