Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page VIII-13 <br /> Forward Inc.Landfill 2018 Expansion Project <br /> used in the ambient air quality analysis is available in the AQIA by SCS <br /> Engineers(See Appendix G 14). " <br /> The Air Quality Impact Assessment(AQIA) (DSEIR Appendix G),which was the basis <br /> for the air quality evaluations) calculated the impact of criteria pollutants and presented <br /> them in Table 3-17. The AQIA has been revised in response to other SJVAPCD <br /> comments, and the revised AQIA is included as Appendix G of the FEIR. Impacts <br /> greater than the Significant Impact Level (SIL)established by the SJVAPCD, CEQA <br /> thresholds,or impacts that result in a new exceedance of the AAQS would be considered <br /> significant. TAs described in revised Mitigation Measure IV.D-2,below,the applicant <br /> will be required to mitigate any such significant impacts to a level that is less than <br /> significant, to the satisfaction of the SJVAPCD and San Joaquin County. The <br /> implementation of this measure will be monitored by the County as described in the <br /> Mitigation Monitoring and Reporting Program. <br /> The revised dispersion modeling conducted for the Final SEIR(in response to SJCAPCD <br /> comments) also found that at Future Permitted levels (640 truck trips per day)PM10 and <br /> PM2.5 would contribute to background concentrations that exceed the NAAQS and <br /> CAAQS(the same impact as identified in the DSEIR).The revised AAQS results are <br /> presented in Table 1,below. <br /> Table 1-Criteria Pollutant Modeling Results <br /> �- Avging. CA CP Project Background Total Project <br /> Pollutant Time AAQS SIL Impact Impact Impact Cone. Cone. Increase <br /> 8 Hour 23000 500 151 239 278 31 309 127 <br /> CO <br /> 1 Hour 10000 2000 183 301 339 31 370 156 <br /> Annual 56 1 1.07 2.01 2.03 55 57.03 0.96 <br /> NOz <br /> 1 Hour 189 7.5 31.4 78.7 78.1 109 187.1 46.7 <br /> Annual 80 1 1.70 1.70 1.80 19.2 21 0.10 <br /> 24 Hour 105 5 14.4 14.4 17.1 19.2 36.3 2.7 <br /> SOz <br /> 3 Hour 1330 25 26.8 26.8 31.5 19.2 50.7 4.7 <br /> 1 Hour 200 7.8 27.5 27.5 32.9 19.2 52.1 5.4 <br /> Annual 20 1 6.07 15.1 15.1 26 41.1 9.03 <br /> PM10 <br /> 24 Hour 50 5 108 270 270 110.9 380.9 162 <br /> Annual 12 1 1.38 3.42 3.41 14.1 17.51 2.03 <br /> PMIS <br /> 24 Hour 35 5 24.0 60.0 60.0 65.5 125.5 36 <br /> Project increases own reflects Project to Current Actual.Increases that are above the SIL and <br /> above the California AAQS are in bold and underlined. <br /> Notes:All units are micrograms per cubic meter(pg/m3). <br /> Abbreviations:Averaging(Avging.),Current Actual(CA),Current Permitted(CP),Concentration <br /> (Cone.). <br /> 1 <br />