Laserfiche WebLink
I <br /> I <br /> John Fundcrburg, Principal Planner ' <br /> October 30, 2018 <br /> Page 13 <br /> I <br /> DEIR). See alsn Exhibit F (Written Statements itegarding Forward <br /> Landfill). <br /> In addition to causing a mess, mud causes a safety hazard since vehicles call slide out of <br /> conta-ol if forced to come to a rapid stop or because drivers are, unable to sce the road ' <br /> because of mud on their windtihields or because the roadway lane lines are covered in <br /> mud. Id. <br /> The current SDBIR asserts that subsequent to the 2013 ETR, Forward upgraded rLs <br /> 11 tire wash system nt the landfill's main driveway. SDEIR at 111-33_ Despite this now <br /> (cont.) system, mud continues to be transported onto Austin Road. See Photographs of Anstin <br /> r er 2018 attached as Exhibit G. The 2012 RIR included a inifi tion mcasure <br /> Road, October � ' <br /> calling for the expeditious removal crfmud rn ect dirt from the adjacent sU s at the end of <br /> eaof ch�rn�lcday.. ,See ..012 T)1'IR aI [V.D-17. One would expect that Forward would <br /> remove mud from Austin Road on a daily basis regardless of the stales of the 2012 <br /> r�� t Clearl Forward is unai.�le or unwilling W remove mud from nearby roads. <br /> I <br /> eC . <br /> P J y� g <br /> Although the current SDEIR includes the same measure(ape SDEIR at 1V.D-19), the <br /> County must place conditions on Forwar'd's use permit so that Forward is required to <br /> remedy this serious situation. ' <br /> F. The SDEIR Fails to ,adequately Analyze the Project's TranSp(ir•tatinn ' <br /> impacts. <br /> 1. The SDEIR Falls lu AdequatelY Aual)�ze the Project's Polerrtial <br /> to Increase Traffic CnUisimis. <br /> In our October 24, 2012 letter on the DEiR for the prior expansion project,we <br /> requested an analysis of the Project's potential to cause an increase in accidents for ' <br /> drivers iv]-to much share two-lane highways with the landfill's heavy-duty trucks. The <br /> 12 FEIR declined to conduct this analysis,claiming that rhe potential accident hazard from <br /> the proposed project's increased truck volume would be negligible. it provided lett <br /> �tia support for its conchisinn. <br /> evidentiary rpt r t <br /> The current SDEIR identifies collision records for die past three years (2015, ' <br /> 2416,and 2017)and idents ics almost 40 accidents that h8VC oCCUrred near the landfill. <br /> The records show that there were 15 collisions on Arch Road between Kingsley Road and <br /> Austin Road; 14 collisions on Fast French Camp Road between Austin Road and SR 99; <br /> and U collisions along; Austin Road between Arch (toad and East Fiench Camp Road. ' <br /> SDFIR at IV.B•16. <br /> SHUTE, M111ALY I <br /> W L I N BEKGLkrrr <br />