Laserfiche WebLink
r <br /> Forward Inc. Landfill Expansion Project MMRP <br /> 80. (F.Sb.)Identified in this SEIR: <br /> Any observations of Swainson's hawk,Golden eagle,white-tailed kite,burrowing owl, ' <br /> loggerhead shrike and/or California horned lark during the falconry program shall be recorded <br /> and monitored by the falconer. If any interactions(i.e. chasing)between the trained falcons and <br /> Swainson's hawks or other special status bird species are observed,this shall be documented and ' <br /> reported to the USFWS Migratory Bird Treaty Office and CDFW within 48 hours of occurrence. <br /> Appropriate additional measures to avoid impacts to special status birds shall be determined <br /> through consultation with the USFWS Migratory Bird Treaty Office and CDFW. ' <br /> 81. (F.6)Identified in this SEIR. <br /> Preconstruction surveys, consistent with the MBTA and the SJMSCP, shall be conducted for <br /> nesting birds during the nesting season(i.e.,February 1 —September 1). Appropriate measures to ' <br /> avoid impacts to nesting birds shall be determined through consultation with the USFWS <br /> Migratory Bird Treaty Office and CDFW. <br /> 82. (F.8)Identified in this SEIR: ' <br /> The project shall comply with the SJMSCP mitigation requirements for the conversion of row and <br /> field crop lands(SJCOG 2000). Under the SJMSCP(2000), each acre of Swainson's hawk <br /> habitat(i.e.,Agricultural Habitat Lands)converted to non-open space uses would be mitigated by ' <br /> the establishment of 1 acre of Row and Field Crop/Riparian Preserve(a 1:1 mitigation ratio). <br /> This measure would apply to the 8.6 acres of land to be developed in the southern portion of the <br /> property. ' <br /> 83. (F.10)Identified in this SEIR: <br /> Rodenticides and methods of application used at the landfill shall be reviewed by a qualified ' <br /> biologist approved by the SJMSP TAC,to determine if they reflect the most effective and safe <br /> methods for controlling rodents. That biologist shall make recommendations for improvement if <br /> needed. <br /> 84. (11.1)Identified in the 2013 EIR(superseded by Mitigation F.1,above):Wier-to site r <br /> grading,the r jeet sponsor- <br /> Clean Water-Aet and Seefien 1602 ef�he Califemia Fish and Game Cede. These peniaits, <br /> administered b the DAi7QCB T S A CE and GDFG <br /> leti el. would sp if the mitigation <br /> on <br /> rcuacres«v mooacaen prejec�Pcrci«� ..d t.. .,. A io« ,,. M.tig..... an-,Monitoring Plan shall be prepai-7ed and submitted for-ageney r-eview to enswe ' <br /> ccfie net » <br /> wildlife value of aefeage of wetlands or r4paFian habitat. At a the Plan shall inelude <br /> i <br /> areas,along with an appfepfiate tipland buffer-,be plaeed in a pefmanefA eensefvation easem <br /> The X17 «1 d N fi fi «:en e .7 H�fep. to frog Dl 11 ll ..ludo the f' lle ,letails <br /> -rna��ccrmzcrrrrrcrstrciviruncrircvracvrargx xui:9r:an-iir ... ., ...,...:b.....»...,. <br /> ifieluding the types and extent of eaeh habitat type to b <br /> CFCate ' 1 <br /> meeting• Mitigation fef less ef existing wetlands shall be pr-evided by the efeatien of 4 aefes (3:1 <br /> mitigation fatie)ef wetlands and 9 aefes of <br /> r4pafian I <br /> plantings(2:1 mifigatien fatie). <br /> Page 30 <br />